Table 5.1 – Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

21 Sep 2022

Reminder 1:

The Contractor is reminded to increase watering for dust suppression at haul roads (Portion 1 - YLSTW).

NA

28 Sep 2022

Reminder 1:

The Contractor is reminded to increase watering for dust suppression during the demolition of S.A.S. Thickener House (Portion 1 - YLSTW).

NA

Noise

6 Jul 2022

Reminder 1:

The Contractor is reminded to properly maintain the function of the noise barriers and silentup at the northern and western site boundary (Portion 1 - YLSTW).

NA

12 Jul 2022

Reminder 1:

The Contractor is reminded to properly maintain the function of the noise barriers and silentup at the northern and western site boundary (Portion 1 - YLSTW).

NA

9 Aug 2022

Reminder 1:

The Contractor is reminded to maintain and reinstate the silentup at western and northern site boundary (Portion 1 - YLSTW).

NA

Water Quality

12 Jul 2022

Reminder 1:

The Contractor is reminded to provide sand bags to prevent silty runoff into the storm drains (Portion 1 - YLSTW).

NA

31 Aug 2022

Reminder 1:

The Contractor is reminded to provide sandbags to prevent runoff into storm drain near piling area (Portion 1 - YLSTW).

NA

Chemical and Waste Management

17 Aug 2022

Observation 1:

Clean up the oil stain on road with chemical absorbent pad and treat it as chemical waste for disposal (Portion 1 - YLSTW).

18 Aug 2022

13 Sep 2022

Reminder 1:

The Contractor is reminded to clean up the oil stain on road with chemical absorbent pad and treat it as chemical waste for disposal (Portion 1 - YLSTW).

NA

Land Contamination

NA

Ecological Impact

12 Jul 2022

Reminder 1:

The Contractor is reminded to maintain and reinstate the bird curtains at the eastern and northern site boundary (Portion 1 - YLSTW).

NA

20 Jul 2022

Reminder 1:

The Contractor is reminded to maintain and reinstate the bird curtains at the eastern and northern site boundary (Portion 1 - YLSTW).

NA

Landscape and Visual Impact

27 Jul 2022

Recommendation 1:

Please keep Tree Protection Zone clear of construction material (Portion 1 - YLSTW).

NA

9 Aug 2022

Recommendation 1:

Stockpile to be removed from tree protection zone beside the temporary admin office (MIC) (Portion 1 - YLSTW).

NA

17 Aug 2022

Observation 1:

Please keep tree protection zone free of construction material beside the temporary admin office (MIC) (Portion 1 - YLSTW).

26 Aug 2022

Recommendation 1:

Ficus microcarpa at eastern / northern edge of site are observed with “朱紅毛斑蛾”, please liaise with relevant maintenance parties for pest control (Portion 1 - YLSTW).

NA

24 Aug 2022

Observation 1:

Please keep tree protection zone clear of construction material outside MIC area (Portion 1 - YLSTW).

26 Aug 2022

Permit / Licenses

NA

Others

NA