Table
5.1 – Observations and Recommendations of Site Audit
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Air
Quality |
21 Sep 2022 |
Reminder 1: The Contractor is reminded to
increase watering for dust suppression at haul roads (Portion 1 - YLSTW). |
NA |
28 Sep 2022 |
Reminder 1: The Contractor
is reminded to increase watering for dust suppression during the demolition
of S.A.S. Thickener House (Portion 1 - YLSTW). |
NA |
|
Noise |
6 Jul 2022 |
Reminder 1: The Contractor is reminded to
properly maintain the function of the noise barriers and silentup
at the northern and western site boundary (Portion 1 - YLSTW). |
NA |
12 Jul 2022 |
Reminder 1: The Contractor
is reminded to properly maintain the function of the noise barriers and silentup at the northern and western site boundary
(Portion 1 - YLSTW). |
NA |
|
9 Aug 2022 |
Reminder 1: The Contractor is reminded to maintain and reinstate
the silentup at western and northern site boundary (Portion
1 - YLSTW). |
NA |
|
Water
Quality |
12 Jul 2022 |
Reminder 1: The Contractor
is reminded to provide sand bags to prevent silty
runoff into the storm drains (Portion 1 - YLSTW). |
NA |
31 Aug 2022 |
Reminder 1: The Contractor is reminded to
provide sandbags to prevent runoff into storm drain near piling area (Portion
1 - YLSTW). |
NA |
|
Chemical
and Waste Management |
17 Aug 2022 |
Observation 1: Clean up the oil
stain on road with chemical absorbent pad and treat it as chemical waste for
disposal (Portion 1 - YLSTW). |
18 Aug 2022 |
13 Sep 2022 |
Reminder 1: The Contractor is reminded to clean
up the oil stain on road with chemical absorbent pad and treat it as chemical
waste for disposal (Portion 1 - YLSTW). |
NA |
|
Land
Contamination |
NA |
||
Ecological
Impact |
12 Jul 2022 |
Reminder 1: The Contractor is reminded to
maintain and reinstate the bird curtains at the eastern and northern site
boundary (Portion 1 - YLSTW). |
NA |
20 Jul 2022 |
Reminder 1: The Contractor
is reminded to maintain and reinstate the bird curtains at the eastern and
northern site boundary (Portion 1 - YLSTW). |
NA |
|
Landscape
and Visual Impact |
27 Jul 2022 |
Recommendation 1: Please keep Tree Protection Zone
clear of construction material (Portion 1 - YLSTW). |
NA |
9 Aug 2022 |
Recommendation 1: Stockpile to be
removed from tree protection zone beside the temporary admin office (MIC) (Portion
1 - YLSTW). |
NA |
|
17 Aug 2022 |
Observation 1: Please keep tree protection zone
free of construction material beside the temporary admin office (MIC)
(Portion 1 - YLSTW). |
26 Aug 2022 |
|
Recommendation 1: Ficus microcarpa at
eastern / northern edge of site are observed with “朱紅毛斑蛾”, please liaise with relevant maintenance parties for
pest control (Portion 1 - YLSTW). |
NA |
||
24 Aug 2022 |
Observation 1: Please keep tree protection zone clear
of construction material outside MIC area (Portion 1 - YLSTW). |
26 Aug 2022 |
|
Permit
/ Licenses |
NA |
||
Others |
NA |