7. IMPLEMENTATION STATUS OF ENVIRONMENTAL
MITIGATION MEASURE
The Contractor had implemented
environmental mitigation measures as stated in the EIA Report, the EP and
EM&A Manual. The implementation status of the recommended mitigation
measures during the reporting period
is summarized in Appendix G.
The status of
required submissions under the EP as of the reporting period are summarized in Table 7.1.