Table
5.1 – Observations and Recommendations of Site Audit
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Air
Quality |
9 Feb 2022 |
Reminder 1: The Contractor is reminded to
increase watering for dust suppression during the demolition of sediment
tank. |
9 Feb 2022 |
8 Mar 2022 |
Reminder 1: The Contractor
is reminded to increase watering for dust suppression during the demolition
of sediment tank. |
8 Mar 2022 |
|
Noise |
NA |
||
Water
Quality |
26 Jan 2022 |
Observation 1: Silty deposit
in gullies should be cleaned at Zone 2. |
27 Jan 2022 |
Observation 2: Mitigation measure should be
provided to prevent direct discharge of runoff near the main entrance. |
|||
Reminder 1: The Contractor
is reminded to de-silt the gullies near the main entrance. |
|||
23 Mar 2022 |
Reminder 1: The Contractor is reminded to prevent
direct discharge of silt-laden water into the storm drain near the temporary transformer
room. |
23 Mar 2022 |
|
Chemical
and Waste Management |
11 Jan 2022 |
Reminder 1: The Contractor
is reminded to provide drip tray for the chemical containers. |
11 Jan 2022 |
Land
Contamination |
NA |
||
Ecological
Impact |
29 Mar 2022 |
Reminder 1: The Contractor
is reminded to maintain and reinstate the bird curtain at the eastern site
boundary. |
NA |
Landscape
and Visual Impact |
9 Feb 2022 |
Recommendation 1: Recommend to keep
tree protection zone free of construction materials. |
NA |
Recommendation 2: Recommend to provide regular maintenance check on dead branches and
remove where necessary. |
|||
23 Feb 2022 |
Recommendation 1: Please exercise caution when
operating heavy machinery close to existing trees. |
NA |
|
8 Mar 2022 |
Follow-up 1: Provide damp
hessian to cover exposed roots underneath existing footpath for Tree No. T168
– T173 near site entrance. |
8 Mar 2022 |
|
Follow-up 2: Remove stockpile under dripline area
for Tree No. T173 – T188 near site entrance. |
|||
Reminder 1: Avoid mechanical
injury of crown and branches by sheet pile clamp during driving for Tree No.
T168 – T173 near site entrance. |
NA |
||
16 Mar 2022 |
Reminder 1: Contractor is reminded to keep
planting area free of construction debris such as T020 & T022. |
16 Mar 2022 |
|
Reminder 2: Caution when
work next to existing trees at CLP station area. |
NA |
||
23 Mar 2022 |
Reminder 1: Please exercise caution when working
near existing trees at (former changing room area) CLP area. |
NA |
|
29 Mar 2022 |
Observation 1: Trunk damage
observed for Tree T252, tree maintenance work is recommended. |
NA |
|
Permit
/ Licenses |
NA |
||
Others |
NA |