7.      IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE

7.1        Implementation Status

The Contractor had implemented environmental mitigation measures and requirements as stated in the EIA Report, the EP and EM&A Manual. The implementation status of the environmental mitigation measures during the reporting period is summarized in Appendix G.

The status of required submissions under the EP as of the reporting period are summarized in Table 7.1.