· Site
formation works at PST no. 5 & 8; · Demolition
of PST no. 5 & 6 by crusher and breaker; · Demolition
of FST no. 7 & 8 by crusher and breaker; · Driven
H-pile at IW & PST Stage 1 by 4 rigs; · Installation
of sheet pile at Zone 2A; · Construction
RC structure at Zone 3 (Temp. sludge holding tank); · Back fill
and reinstatement work at Zone 1 diversion area; · Demolition
of changing room by crusher and breaker; and · Site
formation work for temp. Water heater house. |
· Site
formation works at PST no. 5 & 6; · Demolition
of FST no. 7 & 8 by crusher excavator; · Pre-drill
work at PST Stage 1 by 1 rig; · Installation
of sheet pile at IW; · Pile load
test at IW; · Installation
of sheet pile and excavation work at Zone 2A; · Construction
of RC structure at Zone 3 (Temp. Sludge Holding Tank and Temp. Water Heater Tank); · Reinstatement
work at Zone 1 diversion area; · Overhaul work at Sludge Digestion Tank; and · Env. Drill holes at Waste Storage Area. |
· Site
formation works at PST no. 5 & 6; · Demolition
of FST no. 7 & 8 by crusher excavator; · Pre-drill
work at A. tank by 1 rig; · Installation
of sheet pile at IW & PST; · Pile load
test at IW & PST; · Diversion
work at Zone 2A; · Construction RC structure at Zone 3 (Temp. Gravity tank, Temp. Sludge Holding
Tank and Temp. Water Heater Tank); · Reinstatement work at Zone 1 diversion area; · Overhaul work at Sludge Digestion Tank; and · Env. Drill holes at Waste Storage Area. |