Table 5.1 – Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

3 Nov 2021

Reminder 1:

The Contractor is reminded to cover the excavated soil properly with tarpaulin sheets to prevent dust emission (Portion 1 – YLSTW).

3 Nov 2021

30 Nov 2021

Reminder 1:

The Contractor is reminded to increase watering for dust suppression at loading/unloading area (Portion 1 – YLSTW).

30 Nov 2021

Noise

NA

Water Quality

12 Oct 2021

Observation 1:

Provide mitigation to prevent direct discharge of silt water into the storm drain (Portion 1 – YLSTW).

12 Oct 2021

Observation 2:

Gullies should de-silt near the main entrance of the piling area (Portion 1 – YLSTW).

Reminder 1:

The Contractor is reminded to provide sandbags along inner edge of U channel to prevent inflow of silty runoff (Portion 1 – YLSTW).

22 Dec 2021

Reminder 1:

The Contractor is reminded to de-silt the gullies near the piling area (Portion 1 – YLSTW).

23 Dec 2021

Chemical and Waste Management

24 Nov 2021

Observation 1:

Clean up the oil stain on road in front of Methane Compressor House with chemical absorbent pad and treat it as chemical waste for disposal (Portion 1 – YLSTW).

24 Nov 2021

Land Contamination

NA

Ecological Impact

13 Dec 2021

Reminder 1:

The Contractor is reminded to maintain and reinstate the silentup at the western site boundary (Portion 1 – YLSTW).

14 Dec 2021

29 Dec 2021

Recommendation 1:

The Contractor is recommended to maintain and reinstate the bird curtains at the eastern and northern site boundary (Portion 1 – YLSTW).

NA

Landscape and Visual Impact

6 Oct 2021

Recommendation 1:

Trees behind the dismantling changing room at south boundary should be properly protected according to GLTM of DevB recommended measures or specification for the project (Portion 1 – YLSTW).

6 Oct 2021

12 Oct 2021

Observation 1:

Demolition of changing room ensure removal of concrete debris process do not causing unnecessary damage of branches by backhoe (Portion 1 – YLSTW).

15 Oct 2021

Observation 2:

Re-alignment of water barrier to enlarge Tree Protection Zone (Portion 1 – YLSTW).

20 Oct 2021

Reminder 1:

Demolition works at changing room area should be handled with care to protect trees (Portion 1 – YLSTW).

20 Oct 2021

3 Nov 2021

Recommendation 1:

Keep area around retained trees clear of construction material as far as possible (Portion 1 – YLSTW).

4 Nov 2021

17 Nov 2021

Recommendation 1:

Keep tree protection zone clear of construction equipment / tools (Portion 1 – YLSTW).

17 Nov 2021

30 Nov 2021

Recommendation 1:

Keep tree protection zone free of stockpiling or construction materials (Portion 1 – YLSTW).

1 Dec 2021

Permit / Licenses

NA

Others

NA