5.1 – Observations and Recommendations of Site Audit
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Air
Quality |
3 Nov 2021 |
Reminder 1: The Contractor is reminded to cover
the excavated soil properly with tarpaulin sheets to prevent dust emission
(Portion 1 – YLSTW). |
3 Nov 2021 |
30 Nov 2021 |
Reminder 1: The Contractor
is reminded to increase watering for dust suppression at loading/unloading
area (Portion 1 – YLSTW). |
30 Nov 2021 |
|
Noise |
NA |
||
Water
Quality |
12 Oct 2021 |
Observation 1: Provide
mitigation to prevent direct discharge of silt water into the storm drain
(Portion 1 – YLSTW). |
12 Oct 2021 |
Observation 2: Gullies should de-silt near the main
entrance of the piling area (Portion 1 – YLSTW). |
|||
Reminder 1: The Contractor
is reminded to provide sandbags along inner edge of U channel to prevent
inflow of silty runoff (Portion 1 – YLSTW). |
|||
22 Dec 2021 |
Reminder 1: The Contractor is reminded to
de-silt the gullies near the piling area (Portion 1 – YLSTW). |
23 Dec 2021 |
|
Chemical
and Waste Management |
24 Nov 2021 |
Observation 1: Clean up the
oil stain on road in front of Methane Compressor House with chemical
absorbent pad and treat it as chemical waste for disposal (Portion 1 –
YLSTW). |
24 Nov 2021 |
Land
Contamination |
NA |
||
Ecological
Impact |
13 Dec 2021 |
Reminder 1: The Contractor
is reminded to maintain and reinstate the silentup
at the western site boundary (Portion 1 – YLSTW). |
14 Dec 2021 |
29 Dec 2021 |
Recommendation 1: The Contractor is recommended to
maintain and reinstate the bird curtains at the eastern and northern site
boundary (Portion 1 – YLSTW). |
NA |
|
Landscape
and Visual Impact |
6 Oct 2021 |
Recommendation
1: Trees behind
the dismantling changing room at south boundary should be properly protected
according to GLTM of DevB recommended measures or
specification for the project (Portion 1 – YLSTW). |
6 Oct 2021 |
12 Oct 2021 |
Observation 1: Demolition of changing room ensure
removal of concrete debris process do not causing unnecessary damage of
branches by backhoe (Portion 1 – YLSTW). |
15 Oct 2021 |
|
Observation 2: Re-alignment of
water barrier to enlarge Tree Protection Zone (Portion 1 – YLSTW). |
|||
20 Oct 2021 |
Reminder 1: Demolition works at changing room
area should be handled with care to protect trees (Portion 1 – YLSTW). |
20 Oct 2021 |
|
3 Nov 2021 |
Recommendation
1: Keep area
around retained trees clear of construction material as far as possible
(Portion 1 – YLSTW). |
4 Nov 2021 |
|
17 Nov 2021 |
Recommendation 1: Keep tree protection zone clear of
construction equipment / tools (Portion 1 – YLSTW). |
17 Nov 2021 |
|
30 Nov 2021 |
Recommendation
1: Keep tree
protection zone free of stockpiling or construction materials (Portion 1 –
YLSTW). |
1 Dec 2021 |
|
Permit
/ Licenses |
NA |
||
Others |
NA |