7. IMPLEMENTATION STATUS OF ENVIRONMENTAL
MITIGATION MEASURE
The Contractor had implemented
environmental mitigation measures and requirements as stated in the EIA Report,
the EP and EM&A Manual. The implementation status of the environmental
mitigation measures during the reporting period
is summarized in Appendix G.
The status of
required submissions under the EP as of the reporting period are summarized in Table 7.1.