Table
5.1 – Observations and Recommendations of Site Audit
Parameters |
Date |
Observations
and Recommendations |
Follow-up |
Air
Quality |
7 July 2021 |
Observation: Stockpiling of excavated soil
should be covered with impermeable sheeting and contained properly to prevent
contaminated runoff and dust emission at main store area where SI works of
SCAP is conducting. (Portion 1 – YLSTW) |
8 July 2021 |
15 July 2021 |
Reminder 1: The contractor
is reminded to cover the stockpiling of excavated soil with impermeable
sheeting to prevent ingress of water during rainstorms and/ or prevent dust emission
near the demolished PST. (Portion 1 – YLSTW) |
NA |
|
25 Aug 2021 |
Recommendation 1: The Contractor is recommended to increase
watering for dust suppression during demolition of workshop (Portion 1 –
YLSTW). |
25 Aug 2021 |
|
1 Sep 2021 |
Reminder 1: The Contractor
is reminded to cover the excavated soil properly with tarpaulin sheets to
prevent dust emission for trial pit (Portion 1 – YLSTW). |
1 Sep 2021 |
|
16 Sep 2021 |
Observation 1: Wind blown dust is observed when the truck is leaving at site
exit. The Contractor should provide mitigation measures to prevent dust
emission from vehicle wheel & body (Portion 1 – YLSTW). |
16 Sep 2021 |
|
Observation 2: The Contractor
is required to improve the mitigation at present wheel wash area at southern
exit (e.g. provide better bedding of aggregates for preventing muddy water)
(Portion 1 – YLSTW). |
18 Sep 2021 |
||
Noise |
NA |
||
Water
Quality |
7 July 2021 |
Reminder: The contractor
is reminded to provide mitigation measure to prevent silty runoff getting
into the storm drain near main store area. (Portion 1- YLSTW) |
8 July 2021 |
28 July 2021 |
Observation: Mitigation measure should be
provided to prevent direct discharge of runoff at Zone 1 area near detritor. (Portion 1 – YLSTW) |
29 July 2021 |
|
28 July 2021 |
Reminder: The contractor
is reminded to de-silt the gullies near the main entrance to the piling area.
(Portion 1 – YLSTW) |
NA |
|
4 Aug 2021 |
Observation 1: Provide mitigation to prevent
direct discharge of silt-laden water into the storm drain near the boot
cleaning basin (Portion 1 – YLSTW). |
5 Aug 2021 |
|
16 Sep 2021 |
Reminder 1: The Contractor
is reminded to provide MSDS information at WetSEP.
(Portion 1 – YLSTW) |
16 Sep 2021 |
|
23 Sep 2021 |
Observation 1: Mitigation measures should be
provided to intercept silty runoff from the piling area (Portion 1 – YLSTW). |
24 Sep 2021 |
|
Chemical
and Waste Management |
7 July 2021 |
Observation: Stockpiling of
excavated soil should be covered with impermeable sheeting and contained
properly to prevent contaminated runoff and dust emission at main store area
where SI works of SCAP is conducting. (Portion 1 – YLSTW) |
8 July 2021 |
15 July 2021 |
Reminder 1: The contractor is reminded to over
the stockpiling of excavated soil with impermeable sheeting to prevent
ingress of water during rainstorms and/ or prevent dust emission near the demolished
PST. (Portion 1 – YLSTW) |
NA |
|
4 Aug 2021 |
Observation 2: Drip tray should
be provided for the chemical as mitigation to prevent accidental spillage
(Portion 1 – YLSTW). |
5 Aug 2021 |
|
8 Sep 2021 |
Reminder 1: The Contractor is reminded to provide
drip tray for the chemicals to prevent accidental spillage (Portion 1 –
YLSTW). |
8 Sep 2021 |
|
29 Sep 2021 |
Reminder 1: The Contractor
is reminded to cover the excavated soil properly with tarpaulin sheets to
prevent dust emission (Portion 1 – YLSTW). |
29 Sep 2021 |
|
Land
Contamination |
NA |
||
Ecological
Impact |
15 July 2021 |
Reminder 2: The contractor
is reminded to maintain and reinstate the bird curtain at the northern site
boundary. (Portion 1 – YLSTW) |
NA |
25 Aug 2021 |
Reminder 1: The Contractor is reminded to
maintain and reinstate the silentup at the northern
site boundary (Portion 1 –
YLSTW). |
25 Aug 2021 |
|
Landscape
and Visual Impact |
15 July 2021 |
Reminder 3: The contractor
is reminded to closely monitor the tree condition of Tree T028 for open cut
too close to the tree near temporary administration building. (Portion 1 –
YLSTW) |
NA |
Permit
/ Licenses |
NA |
||
Others |
NA |