8.1.1
Site audits were carried out by
ET on weekly basis at least once per week to monitor the implementation of
proper environmental management practices and mitigation measures in the
Project site.
8.1.2
In the reporting month, four
site inspections were carried out on 5, 10, 18 and 25 October 2023.
8.1.3
No outstanding issues were
reported during the reporting month. The ET Leaders Site Environmental Audit are summarized in Appendix M.
8.2.1
The Contractor registered as a
chemical waste producer for the Contract. Sufficient numbers
of receptacles were available for general refuse collection and sorting.
8.2.2
The management of waste
generated by the construction is presented in Table 27.
8.2.3
The monthly summary of waste
flow table is detailed in Appendix I.
8.2.4
If off-site disposal is
required, the excavated marine mud from the land-based works shall be disposed
of at the designated disposal sites within Hong Kong as allocated by the Marine
Fill Committee or other locations as agreed by the Director. The Contractor
shall ensure no spilling and overflowing of materials during loading /
unloading / transportation is allowed.
8.2.5
The Contractor was reminded
that chemical waste should be properly handled temporarily in designated
chemical waste storage area on site in accordance with the Code of Practice on
the Packing, Labelling and Storage of Chemical Waste.