Contents

EXECUTIVE SUMMARY

1          INTRODUCTION

2          AIR QUALITY

3          NOISE

4          WATER QUALITY

5          ECOLOGY MONITORING

6          LANDSCAPE AND VISUAL

7          LAND CONTAMINATION

8          SITE INSPECTION AND AUDIT

9          NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS

10         IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE

11         FUTURE KEY ISSUES

12         CONCLUSION AND RECOMMENDATION

 

Tables

Table 1             Contact Information of Key Personnel

Table 2             Environmental Licenses, Notification and Permits Summary

Table 3             Air Quality Monitoring Equipment

Table 4             Air Quality Monitoring Location

Table 5             Summary of Air Quality Monitoring Results

Table 6             Comparison of 1-hr TSP data with EIA predictions

Table 7             Construction Noise Monitoring Equipment

Table 8             Monitoring Parameters and Frequencies of Noise Monitoring

Table 9             Construction Noise Monitoring Location

Table 10           Summary of Construction Noise Monitoring Results

Table 11           Comparison of Noise monitoring data with EIA predictions

Table 12           Water Quality Monitoring and Sampling Equipment

Table 13           Monitoring Parameters and Frequency

Table 14           Coordinates of Water Quality Monitoring Locations

Table 15           Summary of Water Quality Exceedance

Table 16           Noise Monitoring Parameters (For Active Ardeid Night Roost Survey)

Table 17           Active Ardeid Night Roost Survey Findings

Table 18           Noise Monitoring Parameters (For Active Ardeid Night Roost Survey)

Table 19           Noise Monitoring Parameters

Table 20           Abundance of all Avifauna Species

Table 21           Abundance of Species of Conservation Importance

Table 22           Shannon Diversity Index Value of all Avifauna Species

Table 23           Shannon Diversity Index Value of Species with Conservation Importance     

Table 24           Wetland habitat utilization of all avifauna species      

Table 25           Wetland habitat utilization of avifauna species of conservation importance

Table 26           Noise Monitoring Results (For Ecological Monitoring of Birds)

Table 27           Waste Generated by the Construction and Disposal Ground

Table 28           Status of submissions required under the EP

 

 

Figures

Figure 1           Location of Proposed Yuen Long Effluent Polishing Plant

Figure 2           Location of Construction Dust Monitoring Stations

Figure 3           Noise Monitoring Locations

Figure 4           Water Quality Monitoring Locations

Figure 5           Ecology Monitoring Locations

 

 

Appendix

Appendix A     Construction Programme

Appendix B     Project Organization Chart

Appendix C     Action and Limit Levels

Appendix D     Calibration Certificates/ Reports of Monitoring Equipment

Appendix E     Environmental Monitoring Schedule

Appendix F     Environmental Monitoring Results

Appendix G     Wind Data

Appendix H     Event and Action Plan

Appendix I      Waste Flow Table

Appendix J     Implementation Status of Environmental Mitigation Measures

Appendix K     Weather and Meteorological Conditions

Appendix L     Cumulative statistics on Environmental Complaints, Notifications of Summons and Successful Prosecutions

Appendix M    Summary of the ET Leader’s Site Environmental Audit in the Reporting Month

Appendix N     Outstanding Issues and Deficiencies

Appendix O    Active Night Roost Monitoring Area and Vantage Points; and Noise Monitoring Stations

Appendix P    Ecological Bird Monitoring Area with Locations of Point Count Sites and Transect Route