The Contractor had implemented environmental protection and pollution control / mitigation measures as stated in the EIA Report, the EP and EM&A Manual. Appendix J summarized the Implementation Status of Environmental Mitigation Measures.
The status of required submissions under the EP as of the reporting period are summarized in Table 28.