10         IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE

10.1            Implementation Status of Environmental Protection and Pollution Control / Mitigation Measures

The Contractor had implemented environmental protection and pollution control / mitigation measures as stated in the EIA Report, the EP and EM&A Manual. Appendix J summarized the Implementation Status of Environmental Mitigation Measures.

The status of required submissions under the EP as of the reporting period are summarized in Table 28.