9           NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS

9.1                Non-compliance (Exceedances of AL levels)

9.1.1                No Action / Limit Level exceedance was recorded for 1-hr TSP level at AM1 and AM2 in the reporting month.

9.1.2                No Action / Limit Level exceedance was recorded for construction noise at CM1, CM2 and CM3 in the reporting month.

9.1.3                No Action and Limit Level exceedance were recorded for water quality at M1, M2 and M3 in the reporting month.

9.1.4                No Action / Limit exceedance was recorded for noise levels at stations (NMS1 and NMS2) in close proximity to the active ardeid night roosts in the reporting month.

9.1.5                One exceedance in Action Level was recorded for the ecological monitoring of birds on 4 March 2024 (daytime). This includes decline in Abundance of Species of Conservation Importance in the point count method.

9.1.6                No corrective actions were required according to the Event and Action Plans for the Monitoring Parameters.

9.2                Complaints, Notification of Summons and Successful Prosecutions

9.2.1                No environmental complaints, notification of summons and successful prosecutions was recorded in the reporting month.

9.2.2                Cumulative complaint log, summaries of complaints, notification of summons and successful prosecutions are presented in Appendix L.

9.2.3                No corrective actions were required.