Table 2 Main Construction Works carried out in the Reporting Period
January 2024 |
February 2024 |
March 2024 |
· Ground investigation at SDB · ABWF and E&M works at CLP
substation · ABWF and E&M works at PST · ABWF work and RC structure at IW · Pumping test at AGS · ELS work at AGS · Erection temp. loading platform at AGS · Installation of observation wells and
dewatering well at TTS · Pumping test at TTS · Erection temp. loading platform at TTS · ELS work at TTS · E&M works at Biogas Holder no. 1 · Installation of observation wells and
dewatering well around Sludge digester no. 1-3 · ELS work at STB · Disposal of construction waste as
indicated in Appendix F. |
· Ground investigation at SDB · Demolition at SDB · E&M works at CLP substation · ABWF and E&M works at PST · ABWF work and RC structure at IW · ELS work at AGS · Erection temp. loading platform at AGS · Erection temp. loading platform at TTS · ELS work at TTS · ELS work at STB · Pumping test at Sludge Digester no.
1-3 · ELS work at Sludge Digester no. 1-3 · E&M works at Biogas Holder no. 1 · E&M works at Biogas Holder no. 1 · Disposal of construction waste as
indicated in Appendix F. |
· Demolition at SDB · ABWF work, E&M works and fixing
GRC panel at CLP Substation · ABWF and E&M works at PST · E&M work and RC structure at IW · Erection temp. loading platform at AGS · ELS work at AGS · Erection temp. loading platform at TTS · ELS work at TTS · ELS work at STB · ELS work at Sludge Digester no. 1-3 · E&M work at Biogas Holder no. 1 · Pipeworks for interim scheme · Disposal of construction waste as
indicated in Appendix F. |