Table 6 Observations and Recommendations of Site Audit
Date |
Observations and
Recommendations |
Follow-up |
|
Air Quality |
20240417 |
Observation: Watering
should be provided every two hours for the works area. |
Watering
was provided. |
20240430 |
Observation: Watering
should be increased for the haul road. |
Watering
frequency was increased. |
|
Noise |
20240619 |
Observation
1: The
silent up at northwest of the site should be enclosed. |
The
silent up are well enclosed. |
Water Quality |
20240529 |
Reminder: The
contractor is reminded to increase watering for the haul road. |
NA |
Chemical
and Waste Management |
20240514 |
Reminder: The
contractor was reminded to clear the construction waste regularly. |
NA |
20240605 |
Observation
2: Domestic
waste should be stored inside the enclosed rubbish bin. |
The skip was cleaned. |
|
Land
Contamination |
|
NA |
|
Ecological Impact |
|
NA |
|
Landscape
and Visual Impact |
|
NA |
|
Permit / Licenses |
20240409 |
Reminder: A new NRMM
label should be provided for the Generator at STB. |
NA |
20240425 |
Observation: The
colour of NRMM label for the excavator at PST should be green. |
NRMM label was replaced. |
|
20240514 |
Observation: The
contractor was reminded to display NRMM label on the PME. |
NRMM label was displayed. |
|
20240605 |
Observation
1: NRMM
label for the crane at A Tank should be provided. |
NRMM label was displayed. |
|
20240611 |
Reminder
1: The
Contractor was reminded to provided NRMM label for the crane at A Tank. |
NA |
|
20240626 |
Reminder
1: NRMM
label for the excavator at SD should be provided. |
NA |
|
Others |
|
NA |
|