7.1
Contamination Assessment Report
7.1.1
Risk-Based Remediation Goals (RBRGs) for Industrial have been adopted
for the “Main Storeroom & Workshops” and the laboratory results for the
sampling works (conducted between 30 June 2021 to 16 July 2021) show that there
are no exceedances of the adopted RBRGs for the “Main Storeroom &
Workshops”. As no contaminated soil and groundwater was found within the “Main
Storeroom & Workshops”, no remediation actions are required for contaminated
soil and groundwater for the scheduled land use of the “Main Storeroom &
Workshops”. Their findings are summarized in Contamination Assessment Report
(CAR) and submitted to EPD on 1 November 2021.
7.1.2
Risk-Based Remediation Goals (RBRGs) for Industrial have been adopted
for the “Mechanical Workshop” and the laboratory results for the sampling works
(conducted between 23 July 2021 to 4 August 2021) show that there are no
exceedances of the adopted RBRGs for the “Mechanical Workshop”. As no
contaminated soil and groundwater was found within the “Mechanical Workshop”,
no remediation actions are required for contaminated soil and groundwater for
the scheduled land use of the “Mechanical Workshop”. Their findings are
summarized in Contamination Assessment Report (CAR) and submitted to EPD on 23
November 2021.
7.1.3
Risk-Based Remediation Goals (RBRGs) for Industrial have been adopted
for the “Waste Storage Area” and the laboratory results for the sampling works
(conducted between 24 November 2021 to 6 January 2022) show that there are no
exceedances of the adopted RBRGs for the “Waste Storage Area”. As no
contaminated soil and groundwater was found within the “Waste Storage Area”, no
remediation actions are required for contaminated soil and groundwater for the
scheduled land use of the “Waste Storage Area”. Their findings are summarized
in Contamination Assessment Report (CAR) and submitted to EPD on 29 April 2022.
7.1.4
Risk-Based Remediation Goals (RBRGs) for Industrial have been adopted
for the “SAS Thickener House-1” and the laboratory results for the sampling
works (conducted between 13 April 2022 to 16 May 2022) show that there are no
exceedances of the adopted RBRGs for the “SAS Thickener House-1”. As no
contaminated soil and groundwater was found within the “SAS Thickener House-1”,
no remediation actions are required for contaminated soil and groundwater for
the scheduled land use of the “SAS Thickener House-1”. Their findings are
summarized in Contamination Assessment Report (CAR) and submitted to EPD on 6
July 2022.
7.1.5
Risk-Based Remediation Goals (RBRGs) for Industrial have been adopted
for the “SAS Thickener House-2” and the laboratory results for the sampling
works (conducted between 15 February 2023 to 23 February 2023) show that there
are no exceedances of the adopted RBRGs for the “SAS Thickener House-2”. The
laboratory results are compared against the adopted RBRGs and soil saturation
limit (Csat) for soil samples and the adopted RBRGs
and the solubility limits for groundwater samples. No exceedance of RBRG are recorded for both soil samples and groundwater samples.
Furthermore, no exceedance of the soil saturation limit are
recorded for soil samples. However, the exceedances of solubility limits for
PCRs (C9-C16) are recorded for groundwater samples collected at BH-18, BH-19,
BH-20 and BH-21; and also PCRs (C17-C35) for BH-21. As
no non-aqueous phase liquid (NAPL) was observed during sampling, no further
sampling and remediation are required. As no contaminated soil and groundwater
is found within the “SAS Thickener House-2”, no remediation actions are
required for contaminated soil and groundwater for the scheduled land use of
the “SAS Thickener House-2”. Their findings are summarized in Contamination
Assessment Report (CAR) which was certified by ET Leader and verified by IEC on
31 May 2023 and submitted to EPD on 19th June 2023.