8.1.1
Site audits were carried out by ET on weekly basis
at least once per week to monitor the implementation of proper environmental
management practices and mitigation measures in the Project site.
8.1.2
In the reporting month, four
site inspections were carried out on 5, 11,
19
and 26 June 2024.
8.1.3
No outstanding issues were
reported during the reporting month. The ET Leader’s Site Environmental Audit are
summarized in Appendix M.
8.2
Advice on the Solid and Liquid Waste Management
Status
8.2.1
The Contractor registered as a chemical waste producer for the Contract.
Sufficient numbers of receptacles were available for general refuse collection
and sorting.
8.2.2
The management of waste generated by the construction is presented in Table 27.
8.2.3
The monthly summary of waste flow table is detailed in Appendix I.
8.2.4
If off-site disposal is required, the excavated marine mud from the
land-based works shall be disposed of at the designated disposal sites within Hong
Kong as allocated by the Marine Fill Committee or other locations as agreed by
the Director. The Contractor shall ensure no spilling and overflowing of
materials during loading / unloading / transportation is allowed.
8.2.5
The Contractor was reminded that chemical waste should be properly
handled temporarily in designated chemical waste storage area on site in
accordance with the Code of Practice on the Packing, Labelling and Storage of
Chemical Waste.
9.