Table 2 Main Construction Works carried out in the Reporting Period
July 2024 |
August 2024 |
September 2024 |
·
E&M works and fixing GRC panel at CLP
Substation ·
ABWF and E&M works at PST ·
ABWF, E&M work and RC structure at IW ·
Existing PST demolition ·
Piling at SDB ·
ELS work at AGS ·
ELS work at TTS ·
RC Structure at STB ·
ELS work at Sludge Digester no. 1-3 ·
E&M work at Biogas Holder no. 1 ·
ELS works at emergency bypass chamber ·
Disposal of construction waste as indicated in Appendix F.
|
·
E&M works and fixing GRC panel at CLP Substation ·
ELS works and pipeworks at emergency
bypass chamber ·
ABWF and E&M works at PST ·
ABWF, E&M work and RC structure at IW ·
Piling at SDB ·
ELS work at AGS ·
ELS work at TTS ·
RC Structure at STB ·
ELS work at Sludge Digester no. 1-3 ·
E&M work at Biogas Holder no. 1 ·
ELS works at emergency bypass chamber ·
Disposal of construction waste as indicated in Appendix F.
|
·
E&M works and fixing GRC panel at CLP Substation ·
ELS works and pipeworks at emergency
bypass chamber ·
ABWF, E&M work and RC structure at IW ·
ABWF and E&M works at PST ·
Piling at SDB ·
External works at site-wide of predrilling at walkway ·
ELS work at AGS ·
ELS work at TTS ·
RC Structure at STB ·
ELS work at Sludge Digester no. 1-3 ·
E&M work at Biogas Holder no. 1 ·
ELS works at emergency bypass chamber ·
Disposal of construction waste as indicated in Appendix F. |