Table 6     Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

20240709

Observation:

The contractor should increase watering for the haul road.

Watering was increased.

20240807

Observation:

The contractor should increase watering for the haul road.

Watering was increased.

20240920

Observation:

The contractor should increase watering for the haul road.

Watering was increased.

Noise

20240910

Observation:

The Silentup at northwest of the site should be enclosed.

The Silentup was enclosed.

Water Quality

NA

Chemical and Waste Management

20240731

Reminder:

The contractor was reminded to enclose the rubbish bin and dispose the waste timely.

The rubbish bin was enclosed and the wate will be disposed of weekly.

Land Contamination

20240828

Reminder:

The contractor was reminded to check the and remove the stagnant water in the drip tray.

The stagnant water was removed.

Ecological Impact

NA

Landscape and Visual Impact

20240813

Reminder:

The contractor was reminded to install additional sticky tape for T232.

Additional sticky tape installed.

Permit / Licenses

20240717

Observation:

NRMM label for the excavator at Zone 2B should be provided.

NRMM label was displayed.

20240910

Reminder:

The colour of NRMM label for the generator near AGS should be green.

A new NRMM label was provided

Others

NA