8.1.1
Site audits were carried out by ET on weekly basis
at least once per week to monitor the implementation of proper environmental
management practices and mitigation measures in the Project site.
8.1.2
In the reporting month, five site inspections were carried out on 2, 8, 16, 23 and 30 October 2024.
8.1.3
No outstanding issues were
reported during the reporting month. The ET Leader’s Site Environmental Audit are
summarized in Appendix M.
8.2
Advice on the Solid and Liquid Waste Management
Status
8.2.1
The Contractor registered as a chemical waste producer for the Contract.
Sufficient numbers of receptacles were available for general refuse collection
and sorting.
8.2.2
The management of waste generated by the construction is presented in Table 27.
8.2.3
The monthly summary of waste flow table is detailed in Appendix I.
8.2.4
If off-site disposal is required, the excavated marine mud from the
land-based works shall be disposed of at the designated disposal sites within
Hong Kong as allocated by the Marine Fill Committee or other locations as
agreed by the Director. The Contractor shall ensure no spilling and overflowing
of materials during loading / unloading / transportation is allowed.
8.2.5
The Contractor was reminded that chemical waste should be properly handled
temporarily in designated chemical waste storage area on site in accordance
with the Code of Practice on the Packing, Labelling and Storage of Chemical
Waste.