Table 28 Status
of submissions required under the EP
EP Condition
(EP-565/2019) |
Submission Title |
Submission Status |
Condition
2.9 |
Construction
Phase Emergency Response Plan |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition
2.11 |
Pre-construction
Ardeid Night Roost Survey Report |
Submitted to EPD with ET certification
and IEC verification, finalised and available for public inspection via the
dedicated website. |
EM&A
Manual Sec. 7.3.3 & 7.3.4 |
Baseline
Bird Survey Report |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition
2.12 |
Noise
Mitigation Measures Plan |
Submitted to EPD with ET certification
and IEC verification, finalised and available for public inspection via the
dedicated website. |
Condition
2.13 |
Proposal
for Minimization of Overspill Light to Ecological Sensitive Areas |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition
2.14 |
Supplementary
Contamination Assessment Plan |
Submitted to EPD with ET certification
and IEC verification, finalised and available for public inspection via the
dedicated website. |
Condition
2.14 |
Contamination
Assessment Report for Main Storeroom & Workshops |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition
2.14 |
Contamination
Assessment Report for Mechanical Workshop |
Submitted to EPD with ET certification
and IEC verification, finalised and available for public inspection via the
dedicated website. |
Condition
2.14 |
Contamination
Assessment Report for Waste Storage Area |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition
2.14 |
Contamination
Assessment Report for SAS Thickener House-1 |
Submitted to EPD with ET certification
and IEC verification, finalised and available for public inspection via the
dedicated website. |
Condition
2.14 |
Contamination
Assessment Report for SAS Thickener House-2 |
Submitted to EPD with ET certification and IEC verification, finalised
and available for public inspection via the dedicated website. |
Condition
2.14 |
Contamination
Assessment Report for Screening
Press House |
Certified by ET Leader and verified by
IEC on 14 Oct 2024 and submitted to EPD on 29 Oct 2024, to be finalised and made
available for public inspection via the dedicated website. |
Condition
2.15 |
Landscape
and Visual Mitigation Plan |
Submitted to EPD with ET certification and IEC verification, to be
finalised and made available for public inspection via the dedicated website. |
Condition
3.3 |
Baseline
Monitoring Report |
Submitted to EPD with ET certification
and IEC verification, finalised and available for public inspection via the
dedicated website. |
Condition
3.4 |
Monthly
EM&A Report (from April 2021 to September 2024) |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition
3.5 |
Quarterly
EM&A Report (from April 2021 to September 2024) |
Submitted to EPD with ET certification
and IEC verification, finalised and available for public inspection via the
dedicated website. |
Condition
4.2 |
Environmental
Monitoring Data from April 2021 to September 2024 |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |