8.1.2
No
Action and Limit Level exceedance was recorded for water quality in the
reporting period.
8.1.3
No
Action / Limit exceedance was recorded for noise levels at stations (NMS1 and
NMS2) in close proximity to the active ardeid night roosts in the monitoring
period.
6.1.1
No
Action / Limit exceedance for the ecological monitoring of birds in the
reporting month.
8.1.4
13
environmental site inspections and 13 landscape and visual site audits were
carried out in the reporting period. Recommendations on mitigation measures
were given to the Contractor for remediating the deficiencies identified during
the site inspections.
8.1.5
No
environmental complaints, notification of summons and successful prosecutions
were recorded in the reporting period.
8.1.6
The
EM&A methodology has been effective in monitoring the environmental impacts
of the Project and the effectiveness of the mitigation measures. The data
collected were useful in determining whether the Project had caused
unacceptable impacts on the sensitive receivers. Analysis of all EM&A data
collected throughout the baseline and the impact monitoring periods
demonstrated the environmental acceptability of the Project.
8.2.2
According to the environmental
site inspections performed in the reporting period, the following
recommendations were provided:
Air Quality Impact
·
The contractor should increase watering
for the haul road.
Construction Noise Impact
·
The silentup at west of the Site should be enclosed.
·
The Contractor was remaindered to enclose
the Silentup at northwest of the Site.
Water Quality Impact
·
No specific observation was
identified in the reporting month.
Chemical Waste and Construction Waste Management
·
The domestic waste should be
removed from the site timely.
·
The domestic waste should be
stored inside an enclosed rubbish bin.
Land Contamination
·
No specific observation was
identified in the reporting month.
Ecological Impact
·
No specific observation was
identified in the reporting month.
Landscape and Visual Impact
·
No specific observation was
identified in the reporting month.
Hazard to Life
·
The domestic waste should be
stored in an enclosed rubbish bin and disposed of timely.
·
The Contractor was
reminded to remove the stagnant water at AGS.
Permit/ Licenses
·
The colour of NRMM label for
the forklift at SD should be green.
·
NRMM label should be provided for the road roller at TTS.
· The colour of NRMM label for the excavator at TTS should be green.