Table 6     Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

02102024

Reminder 1:

The contractor should increase watering for the haul road.

Watering was increased.

27112024

Observation 1:

The contractor should increase watering for the haul road.

Watering was increased.

Noise

21112024

Reminder 1:

The Contractor was remaindered to enclose the Silentup at northwest of the Site.

The silentup was enclosed.

18122024

Reminder 1:

The Silentup at west of the Site should be enclosed.

The silentup was enclosed.

Water Quality

NA

Chemical and Construction Waste Management

NA

Land Contamination

NA

Ecological Impact

NA

Landscape and Visual Impact

NA

Permit / Licenses

08102024

Observation 1:

The colour of NRMM label for the forklift at SD should be green.

A new NRMM label was provided

12112024

Observation 1:

The color of NRMM label for the excavator at TTS should be green.

A new NRMM label was provided

10122024

Observation 1:

NRMM label should be provided for the road roller at TTS.

NRMM label was provided

Other

23102024

Reminder 1:

The domestic waste should be removed from the site timely.

The removal frequency was increased.

30102024

Reminder 1:

The domestic waste should be stored inside an enclosed rubbish bin.

An enclosed rubbish bin was provided.

12112024

Reminder 1:

The Contractor was reminded to remove the stagnant water at AGS.

The stagnant water at AGS was removed.

18122024

Reminder 1:

The domestic waste should be stored in an enclosed rubbish bin and disposed of timely.

Enclosed rubbish bin was provided.