Table 2     Main Construction Works carried out in the Reporting Period

January 2025

February 2025

March 2025

·      Fixing GRC panel at CLP Substation

·      ELS works and pipeworks at emergency bypass chamber

·      ABWF, E&M work and RC structure at IW

·      ABWF and E&M works at PST

·      ELS work at SDB

·      External works at site-wide of predrilling at walkway and water meter cabinet

·      ELS work at AGS

·      ELS work at TTS

·      RC Structure at STB

·      Demolish Existing SDT 1-4

·      ELS work at Sludge Digester no. 1-3

·      E&M work at Biogas Holder no. 1

·      Disposal of construction waste as indicated in Appendix F.

·      Fixing GRC panel at CLP Substation

·      ELS works and pipeworks at emergency bypass chamber

·      ABWF, E&M work and RC structure at IW

·      ABWF and E&M works at PST

·      ELS work at SDB

·      External works at site-wide of predrilling at walkway and water meter cabinet

·      ELS work at AGS

·      RC Structure at STB

·      ABWF and E&M works at STB

·      Demolish Existing SDT 1-4

·      ELS work at Sludge Digester no. 1-3

·      E&M work at Biogas Holder no. 1

·      Disposal of construction waste as indicated in Appendix F.

·      Fixing GRC panel at CLP Substation

·      ELS works and pipeworks at emergency bypass chamber

·      ABWF, E&M work and RC structure at IW

·      ABWF and E&M works at PST

·      ELS work at SDB

·      External works at site-wide of predrilling at walkway and water meter cabinet

·      ELS work at AGS

·      RC structure at TTS

·      RC, ABWF and E&M works at STB

·      Demolish Existing SDT 1-4

·      ELS work at Sludge Digester no. 1-3

·      E&M work at Biogas Holder no. 1

·      Disposal of construction waste as indicated in Appendix F.