Table 6     Observations and Recommendations of Site Audit

Parameters

Date

Observations and Recommendations

Follow-up

Air Quality

5 Feb 2025

Observation 1:

Watering should be increased for the haul road.

Watering was increased

11 Feb 2025

Reminder 1:

Sufficient watering should be applied for the works of sheet piling.

Sufficient watering was applied

26 Mar 2025

Reminder 1:

The Contractor was remaindered to increase watering for the haul road.

Watering was increased

Noise

NA

NA

Water Quality

NA

Chemical and Construction Waste Management

11 Feb 2025

Reminder 1:

The construction waste stored in the temporary waste store should be removed from the site timely.

The construction waste was removed timely.

11 Mar 2025

Reminder 1:

The construction and domestic waste at IW should be sorted and removed from site timely.

The construction and domestic waste were sorted and removed.

Land Contamination

11 Feb 2025

Reminder 1:

Drip tray should be provided for the fuel drum.

Drip tray was provided

Ecological Impact

NA

Landscape and Visual Impact

NA

Permit / Licenses

14 Jan 2025

Observation 1:

NRMM label should be provided for the excavator at SD.

NRMM label was provided

5 Mar 2025

Observation 1:

The color and size of the NRMM label for the excavator at AGS was incorrect.

New NRMM label was provided

Other

NA