Table 2 Main Construction Works carried out in the Reporting Period
April 2025 |
May 2025 |
June 2025 |
·
Fixing GRC panel at CLP Substation ·
Pipeworks and manhole
installation at emergency bypass chamber ·
ABWF and E&M works at IW ·
ABWF and E&M works at PST ·
ELS work at SDB ·
External works at site-wide include water meter
cabinet ·
ELS work and RC structure at AGS ·
RC structure at TTS ·
ABWF, E&M work and RC structure at STB ·
Demolish Existing SDT 1-4 and Gas Holder GH2 ·
RC structure at Sludge Digester no. 1-3 with PP1 ·
RC work at Biogas Holder no. 2-3 foundation ·
Disposal of construction waste as indicated in Appendix F. |
·
Fixing GRC panel at CLP Substation ·
ELS works and pipeworks
at emergency bypass chamber ·
ABWF, E&M work at IW ·
ABWF and E&M works at PST ·
ELS work at SDB ·
External works at site-wide of predrilling at
walkway and water meter cabinet ·
ELS work at AGS ·
RC structure at TTS ·
ABWF and E&M works at STB ·
Demolish Existing SDT 1-4 ·
RC work at Sludge Digester no. 1-3 ·
E&M work at Biogas Holder no. 1 ·
Disposal of construction waste as indicated in Appendix F. |
·
Fixing GRC panel at CLP Substation ·
Pipe works and manhole installation at emergency
bypass chamber ·
ABWF, E&M and sheet pile works at IW ·
ABWF, E&M and sheet pile works at PST ·
ELS work at SDB ·
External works at site-wide of predrilling at
walkway and water meter cabinet ·
ELS work at AGS ·
RC structure at TTS ·
ABWF and E&M works at STB ·
Demolish Existing SDT 1-4 ·
RC work at Sludge Digester no. 1-3 ·
E&M work at Biogas Holder no. 1 ·
Disposal of construction waste as indicated in Appendix F. |