Table 6 Observations and Recommendations of Site Audit
Date |
Observations and Recommendations |
Follow-up |
|
Air
Quality |
16 April 2025 |
Observation
1: Insufficient watering for the haul road. |
Watering
was increased |
28 May 2025 |
Reminder 1: Open stockpiles at SDT should be avoided or covered |
Open
stockpiles was covered. |
|
Noise |
13 May 2025 |
Reminder
1: The Contractor was reminded to enclose the silentup at northwest of the Site. |
The silentup was enclosed. |
10 June 2025 |
Observation 1: The silentup
at northwest of the Site should be enclosed. |
The silentup was enclosed. |
|
Water
Quality |
NA |
||
Chemical and Construction Waste
Management |
10 April
2025 |
Reminder 1: The
Contractor was reminded to remove the construction waste from the Site timely |
Removal frequency was increased. |
Land
Contamination |
21 May 2025 |
Reminder
1: The drip
trays should be checked and cleaned regularly |
The drip trays were cleaned. |
Ecological Impact |
NA |
||
Landscape
and Visual Impact |
NA |
||
Permit / Licenses |
2 April 2025 |
Observation 1: The size of NRMM
label for the sheet piling machine at SDB is incorrect. |
New NRMM label was provided |
8
May 2025 |
Observation
1: NRMM label should be provided for the excavator at AGS. |
NRMM
label was provided |
|
Other |
30 April 2025 |
Reminder 1: The Contractor was
reminded to remove the stagnant water at the Main Entrance of the Site. |
The
stagnant water was removed. |