Table 2     Main Construction Works carried out in the Reporting Period

July 2025

August 2025

September 2025

·      Fixing GRC panel at CLP Substation

·      Pipe works and manhole installation at emergency bypass chamber

·      ABWF, E&M and sheet pile works at IW

·      ABWF, E&M and sheet pile works at PST

·      ELS work at SDB

·      External works at site-wide of predrilling at walkway and water meter cabinet

·      ELS work at AGS

·      RC structure at TTS

·      ABWF and E&M works at STB

·      Demolish Existing SDT 1-4

·      RC work at Sludge Digester no.1-3

·      E&M work at Biogas Holder no.1

·      Disposal of construction waste as indicated in Appendix F.

·      Fixing GRC panel at CLP Substation

·      Pipe works and manhole installation at emergency bypass chamber

·      ABWF, E&M and sheet pile works at IW

·      ABWF, E&M and sheet pile works at PST

·      ELS work at SDB

·      External works at site-wide of predrilling at walkway and water meter cabinet

·      ELS work at AGS

·      RC structure at TTS

·      ABWF and E&M works at STB

·      Demolish Existing SDT 1-4

·      RC work at Sludge Digester no. 1-3

·      E&M work at Biogas Holder no. 1

·      Disposal of construction waste as indicated in Appendix F.

·      Fixing GRC panel at CLP Substation

·      Pipe works and manhole installation at emergency bypass chamber

·      ABWF, E&M and sheet pile works at IW

·      ABWF, E&M and sheet pile works at PST

·      ELS work at SDB

·      External works at site-wide of predrilling at walkway and water meter cabinet

·      ELS work at AGS

·      RC structure at TTS

·      ABWF and E&M works at STB

·      Demolish Existing SDT 1-4

·      RC work at Sludge Digester no. 1-3

·      E&M work at Biogas Holder no. 1

·      Disposal of construction waste as indicated in Appendix F.