Table 2 Main Construction Works carried out in the Reporting Period
|
July 2025 |
August 2025 |
September 2025 |
|
·
Fixing GRC panel at CLP Substation ·
Pipe works and manhole installation at emergency bypass chamber ·
ABWF, E&M and sheet pile works at IW ·
ABWF, E&M and sheet pile works at PST ·
ELS work at SDB ·
External works at site-wide of predrilling at walkway and water
meter cabinet ·
ELS work at AGS ·
RC structure at TTS ·
ABWF and E&M works at STB ·
Demolish Existing SDT 1-4 ·
RC work at Sludge Digester no.1-3 ·
E&M work at Biogas Holder no.1 ·
Disposal of construction waste as indicated in Appendix F. |
·
Fixing GRC panel at CLP Substation ·
Pipe works and manhole installation at emergency bypass chamber ·
ABWF, E&M and sheet pile works at IW ·
ABWF, E&M and sheet pile works at PST ·
ELS work at SDB ·
External works at site-wide of predrilling at
walkway and water meter cabinet ·
ELS work at AGS ·
RC structure at TTS ·
ABWF and E&M works at STB ·
Demolish Existing SDT 1-4 ·
RC work at Sludge Digester no. 1-3 ·
E&M work at Biogas Holder no. 1 ·
Disposal of construction waste as indicated in Appendix F.
|
·
Fixing GRC panel at CLP Substation ·
Pipe works and manhole installation at emergency
bypass chamber ·
ABWF, E&M and sheet pile works at IW ·
ABWF, E&M and sheet pile works at PST ·
ELS work at SDB ·
External works at site-wide of predrilling at
walkway and water meter cabinet ·
ELS work at AGS ·
RC structure at TTS ·
ABWF and E&M works at STB ·
Demolish Existing SDT 1-4 ·
RC work at Sludge Digester no. 1-3 ·
E&M work at Biogas Holder no. 1 ·
Disposal of construction waste as indicated in Appendix
F. |