12.
CONCLUSION AND
RECOMMENDATION
12.1.2 Construction noise monitoring was carried out in the reporting month. No Action / Limit Level exceedance at CM1, CM2 and CM3 was recorded during the period.
12.1.3 No Action and Limit Level exceedance was recorded for water quality at M1, M2 and M3 in the reporting month.
12.1.4 Ardeid night roost monitoring was carried out in the reporting month. Two active ardeid night roost areas (ANR1 and ANR2) were observed within the Survey Area. These roosts were located at the mangrove strips in the east and northeast portions of the Project boundary. No Action / Limit Level exceedance at NMS1 and NMS2 was recorded during the period.
12.1.5 Ecological bird monitoring was carried out in the reporting month. No Action / Limit exceedance for the ecological monitoring of birds in the reporting month.
12.1.6 Four environmental site inspections were carried out in the reporting month. Recommendations on mitigation measures for air quality impact, chemical waste and construction waste management and permit/ licenses were given to the Contractor for remediating the deficiencies identified during the site inspections.
12.1.7 Four landscape and visual site audits were carried out in the reporting month. No recommendations on mitigation measures were given to the Contractor for remediating the deficiencies identified during the site inspections.
12.1.8 No environmental complaint, notification of summons and successful prosecution was recorded in the reporting month.
12.2
Comment and
Recommendations
12.2.1
The recommended environmental mitigation measures, as
proposed in the EIA report and EM&A Manual shall be effectively implemented
to minimize the potential environmental impacts from the Project. The EM&A
programme would effectively monitor the environmental impacts generated from
the construction activities and ensure the proper implementation of mitigation
measures.
12.2.2
According to the environmental site inspections
performed in the reporting month, the following recommendations were provided:
Air Quality
Impact
·
No specific observation was
identified in the reporting month.
Construction
Noise Impact
·
No specific observation was identified in
the reporting month
Water
Quality Impact
·
No specific observation was
identified in the reporting month.
Chemical
Waste and Construction Waste Management
·
Domestic waste and
waste should be stored in a covered rubbish bin and removed from
the site timely.
·
Drip tray should be provided for the fuel drum
at SD.
Land
Contamination
·
No specific observation was
identified in the reporting month.
Ecological
Impact
·
No specific observation was
identified in the reporting month.
Landscape
and Visual Impact
·
No specific observation was identified in
the reporting month.
Hazard to
Life
·
No specific observation was
identified in the reporting month.
Permit/
Licenses
·
No specific observation was
identified in the reporting month.
Other
·
No specific observation was
identified in the reporting month.