12.
CONCLUSION AND
RECOMMENDATION
12.1.2
Construction noise monitoring was carried out in the
reporting month. No Action / Limit Level exceedance at CM1, CM2 and CM3 was
recorded during the period.
12.1.3
No Action and Limit Level exceedance was recorded for
water quality at M1, M2 and M3 in the reporting month.
12.1.4
Ardeid night roost monitoring was carried out in the
reporting month. Two active ardeid night roost areas (ANR1 and ANR2) were
observed within the Survey Area. These roosts were
located at the mangrove strips in the east and northeast portions of the
Project boundary. No Action / Limit Level exceedance at NMS1 and NMS2 was
recorded during the period.
12.1.5
Ecological bird monitoring was carried out in the
reporting month. No Action / Limit exceedance for the ecological monitoring of
birds in the reporting month.
12.1.6
Five environmental site inspections were carried out for
Contract DC/2019/10 in the reporting month. Recommendations on mitigation
measures for air quality impact, chemical waste and construction waste management
and permit/ licenses were given to the Contractor for remediating the
deficiencies identified during the site inspections.
12.1.7
One environmental site inspection was carried out for
Contract DE/2020/01 in the reporting month. No recommendations on mitigation
measures were given to the Contractor for remediating the deficiencies
identified during the site inspections
12.1.8
Five landscape and visual site audits were carried out
for Contract DC/2019/10 in the reporting month. No recommendations on
mitigation measures were given to the Contractor for remediating the
deficiencies identified during the site inspections.
12.1.9
No landscape or visual site audit was carried out for
Contract DE/2020/01 in the reporting month as there is no landscape or visual
impact for the indoor works under Contract DE/2020/01.
12.1.10
No environmental complaint, notification of summons and successful prosecution was recorded in the reporting
month.
12.2
Comment and
Recommendations
12.2.1
The recommended environmental mitigation measures, as
proposed in the EIA report and EM&A Manual shall be effectively implemented
to minimize the potential environmental impacts from the Project. The EM&A
programme would effectively monitor the environmental impacts generated from
the construction activities and ensure the proper implementation of mitigation
measures.
12.2.2
According to the environmental site inspections
performed in the reporting month, the following recommendations were provided:
Contract DC/2019/10:
Air Quality Impact
·
Watering should be increased for the haul road.
Construction Noise Impact
·
No specific observation was identified in the
reporting month
Water Quality Impact
·
No
specific observation was identified in the reporting month.
Chemical Waste and Construction Waste
Management
·
No specific observation was identified in the
reporting month.
Land Contamination
·
No
specific observation was identified in the reporting month.
Ecological Impact
·
No
specific observation was identified in the reporting month.
Landscape and Visual Impact
·
No specific observation was identified in the
reporting month.
Hazard to Life
·
No
specific observation was identified in the reporting month.
Permit/ Licenses
·
No
specific observation was identified in the reporting month.
Other
·
No
specific observation was identified in the reporting month.
Contract
DE/2020/01:
Air Quality Impact
·
Watering should be increased for the haul road.
Construction Noise Impact
·
No specific observation was identified in the
reporting month
Water Quality Impact
·
No
specific observation was identified in the reporting month.
Chemical Waste and Construction Waste Management
·
No specific observation was identified in the
reporting month.
Land Contamination
·
No
specific observation was identified in the reporting month.
Ecological Impact
·
No
specific observation was identified in the reporting month.
Hazard to Life
·
No
specific observation was identified in the reporting month.
Permit/ Licenses
·
No specific observation was identified in the
reporting month.
Other
No specific observation was
identified in the reporting month