8.1.1
Site audits were carried out by ET on weekly basis at
least once per week to monitor the implementation of proper environmental
management practices and mitigation measures in the Project site.
8.1.1
In the reporting month, five site inspections for
Contract DC/2019/10 were carried out on 3, 9, 17, 23 and 30 December 2025.
8.1.2
In the reporting month, one site inspection for
Contract DE/2020/01 was carried out on 23 December 2025.
8.1.3
No outstanding issues were reported during the reporting month. The ET
Leader’s Site Environmental Audit are summarized in Appendix M.
8.2
Advice on the
Solid and Liquid Waste Management Status
8.2.1
The Contractors registered as a chemical waste producer for the
Contract. Sufficient numbers of receptacles were available for general refuse
collection and sorting.
8.2.2
The management of waste generated by the construction is presented in Table 27.
8.2.3
The monthly summary of waste flow table is detailed in Appendix I.
8.2.4
If off-site disposal is required, the excavated marine mud from the
land-based works shall be disposed of at the designated disposal sites within
Hong Kong as allocated by the Marine Fill Committee or other locations as
agreed by the Director. The Contractor shall ensure no spilling and overflowing
of materials during loading / unloading / transportation is allowed.
8.2.5
The Contractors was reminded that chemical waste should be properly
handled temporarily in designated chemical waste storage area on site in
accordance with the Code of Practice on the Packing, Labelling and Storage of
Chemical Waste.