12.
CONCLUSION AND
RECOMMENDATION
12.1.2
Construction
noise monitoring was carried out in the reporting month. No Action / Limit
Level exceedance at CM1, CM2 and CM3 was recorded during the period.
12.1.3
No
Action and Limit Level exceedance was recorded for water quality at M1, M2 and
M3 in the reporting month.
12.1.4
Ardeid night roost monitoring was carried out in the
reporting month. Two active ardeid night roost areas (ANR1 and ANR2) were
observed within the Survey Area. These roosts were located at the mangrove
strips in the east and northeast portions of the Project boundary. No Action /
Limit Level exceedance at NMS1 and NMS2 was recorded during the period.
12.1.5
Ecological
bird monitoring was carried out in the reporting month. No Action / Limit
exceedance for the ecological monitoring of birds in the reporting month.
12.1.6
Four environmental site inspections were carried out for
Contract DC/2019/10 in the reporting month. No recommendations on mitigation
measures were given to the Contractor for remediating the deficiencies
identified during the site inspections
12.1.7
Two environmental site inspection were carried out for
Contract DE/2020/01 in the reporting month. No recommendations on mitigation
measures were given to the Contractor for remediating the deficiencies
identified during the site inspections.
12.1.8
Four landscape and visual site audits were carried out
for Contract DC/2019/10 in the reporting month. No recommendations on
mitigation measures were given to the Contractor for remediating the
deficiencies identified during the site inspections.
12.1.9
No landscape or visual site audit was carried out for
Contract DE/2020/01 in the reporting month as there is no landscape or visual
impact for the indoor works under Contract DE/2020/01.
12.1.10
No environmental complaint, notification of summons
and successful prosecution was recorded in the reporting month.
12.2
Comment and
Recommendations
12.2.1
The recommended environmental mitigation measures, as
proposed in the EIA report and EM&A Manual shall be effectively implemented
to minimize the potential environmental impacts from the Project. The EM&A
programme would effectively monitor the environmental impacts generated from
the construction activities and ensure the proper implementation of mitigation
measures.
12.2.2
According to the environmental site inspections
performed in the reporting month, the following recommendations were provided:
Contract DC/2019/10:
Air Quality Impact
·
No
specific observation was identified in the reporting month.
Construction Noise Impact
·
No specific observation was identified in the
reporting month
Water Quality Impact
·
No
specific observation was identified in the reporting month.
Chemical Waste and Construction Waste
Management
·
No specific observation was identified in the
reporting month.
Land Contamination
·
No
specific observation was identified in the reporting month.
Ecological Impact
·
No
specific observation was identified in the reporting month.
Landscape and Visual Impact
·
No specific observation was identified in the
reporting month.
Hazard to Life
·
No
specific observation was identified in the reporting month.
Permit/ Licenses
·
No
specific observation was identified in the reporting month.
Other
·
No
specific observation was identified in the reporting month.
Contract DC/2020/01:
Air Quality
Impact
·
No specific observation was identified in the
reporting month.
Construction Noise Impact
·
No specific observation was identified in the
reporting month.
Water Quality Impact
·
No specific observation was identified in the
reporting month.
Chemical Waste and Construction Waste
Management
·
No specific observation was identified in the
reporting month.
Land Contamination
·
No specific observation was identified in the
reporting month.
Ecological Impact
·
No specific observation was identified in the
reporting month.
Hazard to Life
·
No specific observation was identified in the
reporting month.
Permit / Licenses
·
No specific observation was identified in the
reporting month.
Other
·
No specific observation was identified in the
reporting month.