8.1.2
No
Action and Limit Level exceedance was recorded for water quality in the
reporting period.
8.1.3
No
Action / Limit exceedance was recorded for noise levels at stations (NMS1 and
NMS2) in close proximity to the active ardeid night
roosts in the monitoring period.
8.1.4
No
Action / Limit exceedance for the ecological monitoring of birds in the reporting period.
8.1.5
13
environmental site inspections and 13 landscape and visual site audits were
carried out for Contract DC/2019/10 in in the reporting period. Recommendations
on mitigation measures were given to the Contractor for remediating the
deficiencies identified during the site inspections.
8.1.6
1 environmental
site inspection was carried out
for Contract DE/2020/01 in in the reporting period. Recommendation
on mitigation measure was given to the Contractor for remediating the deficiencies identified
during the site inspections
8.1.7
No landscape or visual site audits were
carried out for Contract DE/2020/01 in the reporting period as there is no
landscape or visual impact for indoor works under Contract DE/2020/01.
8.1.8
No
environmental complaints, notification of summons and successful prosecutions
were recorded in the reporting period.
8.1.9
No landscape or visual site audits were
carried out for Contract DE/2020/01 in the reporting period as there is no
landscape or visual impact for indoor works under Contract DE/2020/01.
8.1.10
The
EM&A methodology has been effective in monitoring the environmental impacts
of the Project and the effectiveness of the mitigation measures. The data
collected were useful in determining whether the Project had caused
unacceptable impacts on the sensitive receivers. Analysis of all EM&A data
collected throughout the baseline and the impact monitoring periods
demonstrated the environmental acceptability of the Project.
8.2.1 According to the environmental site inspections performed in the reporting period, the following recommendations were provided:
Contract
DC/2019/10:
Air Quality
Impact
·
Watering should be increased for the haul
road.
Construction
Noise Impact
·
No specific observation was
identified in the reporting period.
Water
Quality Impact
·
No specific observation was
identified in the reporting period.
Chemical
Waste and Construction Waste Management
·
Domestic waste and waste should be stored
in a covered rubbish bin and removed from the site timely.
·
Drip tray should be provided for the fuel
drum at SD.
Land
Contamination
·
No specific observation was
identified in the reporting period.
Ecological
Impact
·
No specific observation was
identified in the reporting period.
Landscape
and Visual Impact
·
No specific observation was
identified in the reporting period.
Hazard to
Life
·
No specific observation was
identified in the reporting period.
Permit/
Licenses
·
The color of
NRMM label for the generator at SDB should be green.
Other
·
No specific observation was
identified in the reporting period.
Contract
DE/2020/01:
Air Quality
Impact
·
No specific observation was
identified in the reporting period.
Construction
Noise Impact
·
No specific observation was
identified in the reporting period.
Water
Quality Impact
·
No specific observation was
identified in the reporting period.
Chemical
Waste and Construction Waste Management
·
No specific observation was
identified in the reporting period.
Land
Contamination
·
No specific observation was
identified in the reporting period.
Ecological
Impact
·
No specific observation was
identified in the reporting period.
Landscape
and Visual Impact
·
No specific observation was
identified in the reporting period.
Hazard to
Life
·
No specific observation was
identified in the reporting period.
Permit/
Licenses
·
No specific observation was
identified in the reporting period.
Other
·
No specific observation was
identified in the reporting period.