Table 2     Main Construction Works carried out in the Reporting Period

October 2025

November 2025

December 2025

Contract DC/2019/10:

·      Fixing GRC panel at CLP Substation

·      Pipe works and manhole installation at emergency bypass chamber

·      ABWF, E&M and sheet pile works at IW

·      ABWF, E&M and sheet pile works at PST

·      ELS work at SDB

·      External works at site-wide of predrilling at walkway and water meter cabinet

·      ELS work at AGS

·      RC structure at TTS

·      ABWF and E&M works at STB

·      Demolish Existing SDT 1-4

·      RC work at Sludge Digester no. 1-3

·      E&M work at Biogas Holder no. 1

·      Zone SD Waterproofing and Backfill for Remove S2

·      Disposal of construction waste as indicated in Appendix F.

Contract DC/2019/10:

·      Fixing GRC panel at CLP Substation

·      ELS Works for Modification of Existing Inspection Chamber and Inlet Effluent Pipes from NSWSPS

·      T&C Works at IW

·      ELS works at IW (Remaining area)

·      ELS works at PST Stage 2

·      ELS work at SDB

·      Demolition work of existing building at ADB

·      External works at site-wide include water meter cabinet

·      RC works at AGS

·      RC structure at TTS

·      ABWF and E&M works at STB

·      Demolish Existing SDT 1-4

·      RC work at Sludge Digester no. 1-3

·      T&C work at Biogas Holder no.1

·      Disposal of construction waste as indicated in Appendix F.

Contract DC/2019/10:

·      Fixing GRC panel at CLP Substation

·      ELS Works and Pipe works for Modification of Existing Inspection Chamber and Inlet Effluent Pipes from NSWSPS

·      T&C Works at IW

·      RC, ABWF and E&M works at IW (Remaining area)

·      RC, ABWF and E&M works at PST Stage 2

·      ELS work and RC work at SDB

·      Predrill works and ELS work at ADB

·      External works at site-wide include water meter cabinet

·      RC structure at AGS

·      RC structure at TTS

·      ABWF and E&M work at STB

·      RC and E&M work at H2S

·      ELS work at UC3

·      RC structure at Sludge Digester no. 1-3 with PP1

·      ELS work at Sludge Digester no. 4-6

·      RC work at Biogas Holder no. 2-3 foundation

·      Disposal of construction waste as indicated in Appendix F.

Contract DE/2020/01:

·      Installation of PV panels

·      Disposal of construction waste as indicated in Appendix F.