8.1.2
No Action
and Limit Level exceedance was recorded for water quality in the reporting
period.
8.1.3
No
Action / Limit exceedance was recorded for noise levels at stations (NMS1 and
NMS2) in close proximity to the active ardeid night roosts in the monitoring
period.
8.1.4
No
Action / Limit exceedance for the ecological monitoring of birds in the reporting period.
8.1.5
12 environmental
site inspections and 12 landscape and visual site audits were carried out for
Contract DC/2019/10 in in the reporting period.
Recommendations on mitigation measures were given to the
Contractor for remediating the deficiencies identified
during the site inspections.
8.1.6
4 environmental
site inspections were carried out
for Contract DE/2020/01 in in the reporting period. Recommendation
on mitigation measure was given to the Contractor for remediating the deficiencies identified
during the site inspections.
8.1.7
No landscape or visual site audits were
carried out for Contract DE/2020/01 in the reporting period as there is no
landscape or visual impact for indoor works under Contract DE/2020/01.
8.1.8
No
environmental complaints, notification of summons and successful prosecutions
were recorded in the reporting period.
8.1.9
The EM&A methodology has
been effective in monitoring the environmental impacts of the Project and the
effectiveness of the mitigation measures. The data collected were useful in
determining whether the Project had caused unacceptable impacts on the sensitive
receivers. Analysis of all EM&A data collected throughout the baseline and
the impact monitoring periods demonstrated the environmental acceptability of
the Project.
8.2.1 According to the environmental site inspections performed in the reporting period, the following recommendations were provided:
Contract
DC/2019/10:
Air Quality
Impact
· No specific observation was identified in the reporting period.
Construction
Noise Impact
· No specific observation was identified in the reporting period.
Water
Quality Impact
· No specific observation was identified in the reporting period.
Chemical
Waste and Construction Waste Management
·
Drip tray should be provided for the fuel
drum at SD.
Land
Contamination
· No specific observation was identified in the reporting period.
Ecological
Impact
· No specific observation was identified in the reporting period.
Landscape
and Visual Impact
· No specific observation was identified in the reporting period.
Hazard to
Life
· No specific observation was identified in the reporting period.
Permit/
Licenses
· The color of NRMM label for the generator at SDB should be green.
Other
· No specific observation was identified in the reporting period.
Contract
DE/2020/01:
Air Quality
Impact
· No specific observation was identified in the reporting period.
Construction
Noise Impact
· No specific observation was identified in the reporting period.
Water
Quality Impact
· No specific observation was identified in the reporting period.
Chemical
Waste and Construction Waste Management
· No specific observation was identified in the reporting period.
Land
Contamination
· No specific observation was identified in the reporting period.
Ecological
Impact
· No specific observation was identified in the reporting period.
Landscape
and Visual Impact
· No specific observation was identified in the reporting period.
Hazard to
Life
· No specific observation was identified in the reporting period.
Permit/
Licenses
· No specific observation was identified in the reporting period.
Other
· No specific observation was identified in the reporting period.