Table 2     Main Construction Works carried out in the Reporting Period

January 2026

February 2026

March 2026

Contract DC/2019/10:

·      Fixing GRC panel and CLP Substation

·      ELS Works and Pipe works for Modification of Existing Inspection Chamber and Inlet Effluent Pipes from NSWSPS

·      T&C Works at IW

·      RC, ABWF and E&M works at IW (Remaining area)

·      RC, ABWF and E&M works at PST Stage 2

·      ELS work and RC work at SDB

·      Predrill works and ELS work at ADB

·      External works at site-wide include water meter cabinet

·      RC structure at AGS

·      RC structure at TTS

·      ABWF and E&M work at STB

·      RC and E&M work at H2S

·      ELS work at UC3

·      RC structure at Sludge Digester no. 1-3 with PP1

·      ELS work at Sludge Digester no. 4-6

·      RC work at Biogas Holder no. 2-3 foundation

·      Disposal of construction waste as indicated in Appendix F.

Contract DE/2020/1:

·      Installation of PV panels

·      Disposal of construction waste as indicated in Appendix F.

Contract DC/2019/10:

·      Fixing GRC panel at CLP Substation

·      ELS Works and Pipe works for Modification of Existing Inspection Chamber and Inlet Effluent Pipes from NSWSPS

·      ABWF and T&C Works at IW

·      ELS works at PST Stage 2

·      RC works at PST Stage 2

·      RC works at SDB

·      ELS works at ADB and Underpass

·      RC works at AGS

·      RC structure at TTS

·      AWBF and E&M works at STB

·      ELS work at Sludge Digester no. 4-6 and UC4

·      E&M work at Sludge Digester no. 1-3

·      T&C work at Biogas Holder no.1

·      Disposal of construction waste as indicated in Appendix F.

Contract DE/2020/1:

·      Installation of PV panels

·      Disposal of construction waste as indicated in Appendix F.

Contract DC/2019/10:

·       Fixing GRC panel and CLP Substation

·       Construction of Existing Inspection Chamber and Inlet Effluent Pipes from Nam Sang Wai Sewage Pumping Station

·       ABWF and T&C Works at IW

·       ELS works at PST Stage 2

·       RC works at SDB

·       ELS works at ADB and Underpass

·       RC works at AGS

·       RC structure at TTS

·       ABWF and E&M works at STB

·       ELS work at Sludge Digester no. 4 -6 and UC4

·       E&M wok at Sludge Digester no. 1-3

·       Water test and rectification work at Sludge Digester no. 1-3

·       T&C work at Biogas Holder no.2

·       Disposal of construction waste as indicated in Appendix F.

Contract DE/2020/1:

·       No site works in March

·       Disposal of construction waste as indicated in Appendix F.