12.
CONCLUSION AND
RECOMMENDATION
12.1.2
Construction noise monitoring was carried out in the reporting month. No
Action / Limit Level exceedance at CM1, CM2 and CM3 was recorded during the
period.
12.1.3
No Action and Limit Level exceedance was recorded for water quality at
M1, M2 and M3 in the reporting month.
12.1.4
Ardeid night roost monitoring was carried out in the reporting month.
Two active ardeid night roost areas (ANR1 and ANR2) were observed within the
Survey Area. These roosts were located at the mangrove strips in the east and
northeast portions of the Project boundary. No Action / Limit Level exceedance
at NMS1 and NMS2 was recorded during the period.
12.1.5
Ecological bird monitoring was carried out in the reporting month. No
Action / Limit exceedance for the ecological monitoring of birds in the
reporting month.
12.1.6
4 environmental site inspections were carried out for Contract DC/2019/10
in the reporting month. Recommendations on mitigation measures for chemical
and construction waste management, permit and licenses were given to the
Contractor for remediating the deficiencies identified during the site
inspections.
12.1.7
One environmental site inspection was carried out for Contract DE/2020/01 in the reporting month. No recommendations on mitigation measures were given to the Contractor for remediating the deficiencies identified
during the site inspections.
12.1.8
Four landscape and visual site audits were carried out for Contract
DC/2019/10 in the reporting month. No recommendation on mitigation measure was given to the Contractor for remediating the deficiencies identified
during the site inspections.
12.1.9
No landscape or
visual site audit was carried out for Contract DE/2020/01 in the reporting
month.
12.1.10
No environmental complaint, notification of summons and successful
prosecution was recorded in the reporting month.
12.2
Comment and
Recommendations
12.2.1
The recommended environmental mitigation measures, as proposed in the
EIA report and EM&A Manual shall be effectively implemented to minimize the
potential environmental impacts from the Project. The EM&A programme would
effectively monitor the environmental impacts generated from the construction
activities and ensure the proper implementation of mitigation measures.
12.2.2
According to the environmental site inspections performed in the
reporting month, the following recommendations were provided:
Contract
DC/2019/10:
Air Quality Impact
· Watering for the haul road should be increased.
Construction Noise
Impact
· No specific observation was identified in the reporting month
Water Quality
Impact
· No specific observation was identified in the reporting month.
Chemical Waste and
Construction Waste Management
·
Domestic waste and construction waste should be stored separately.
·
Domestic waste should be stored in an enclosed rubbish bin.
Land Contamination
· No specific observation was identified in the reporting month.
Ecological Impact
· No specific observation was identified in the reporting month.
Landscape and
Visual Impact
·
No specific observation was identified in the reporting month.
Hazard to Life
· No specific observation was identified in the reporting month.
Permit/ Licenses
·
The color of the NRMM label for the generator at IW should be
green.
Other
· No specific observation was identified in the reporting month.
Contract
DE/2020/01:
Air Quality Impact
· No specific observation was identified in the reporting month
Construction Noise
Impact
· No specific observation was identified in the reporting month
Water Quality
Impact
· No specific observation was identified in the reporting month.
Chemical Waste and
Construction Waste Management
·
No specific observation was identified in the reporting month.
Land Contamination
· No specific observation was identified in the reporting month.
Ecological Impact
· No specific observation was identified in the reporting month.
Hazard to Life
· No specific observation was identified in the reporting month.
Permit/ Licenses
· No specific observation was identified in the reporting month.
Other
· No specific observation was identified in the reporting month.