12.
CONCLUSION AND
RECOMMENDATION
12.1.2
Construction noise monitoring was carried out in the reporting month. No
Action / Limit Level exceedance at CM1, CM2 and CM3 was recorded during the
period.
12.1.3
No Action and Limit Level exceedance was recorded for water quality at
M1, M2 and M3 in the reporting month.
12.1.4
Ardeid night roost monitoring was carried out in the reporting month.
Two active ardeid night roost areas (ANR1 and ANR2) were observed within the
Survey Area. These roosts were located at the mangrove strips in the east and
northeast portions of the Project boundary. No Action / Limit Level exceedance
at NMS1 and NMS2 was recorded during the period.
12.1.5
Ecological bird monitoring was carried out in the reporting month. No
Action / Limit exceedance for the ecological monitoring of birds in the
reporting month.
12.1.6
Four
environmental site inspections were carried out for Contract DC/2019/10 in the
reporting month. Recommendations on mitigation measures for chemical and
construction waste management was given to the Contractor for remediating the
deficiencies identified during the site inspections.
12.1.7
One
environmental site inspection was carried out for Contract DE/2020/01 in the
reporting month. No recommendations on mitigation measures were given to the
Contractor for remediating the deficiencies identified during the site
inspections.
12.1.8
Four landscape
and visual site audits were carried out for Contract DC/2019/10 in the
reporting month. No recommendation on mitigation measure was given to the
Contractor for remediating the deficiencies identified during the site
inspections.
12.1.9
No landscape or
visual site audit was carried out for Contract DE/2020/01 in the reporting
month.
12.1.10
No environmental complaint, notification of summons and successful
prosecution was recorded in the reporting month.
12.2
Comment and Recommendations
12.2.1
The recommended environmental mitigation measures, as proposed in the
EIA report and EM&A Manual shall be effectively implemented to minimize the
potential environmental impacts from the Project. The EM&A programme would
effectively monitor the environmental impacts generated from the construction
activities and ensure the proper implementation of mitigation measures.
12.2.2
According to the environmental site inspections performed in the
reporting month, the following recommendations were provided:
Contract DC/2019/10:
Air Quality Impact
· No specific
observation was identified in the reporting month.
Construction Noise
Impact
·
No specific observation was identified in the
reporting month
Water Quality Impact
·
No specific observation was identified in the
reporting month
Chemical Waste and
Construction Waste Management
· Drip tray should be
provided for the fuel drum at SD.
Land Contamination
· No
specific observation was identified in the reporting month.
Ecological Impact
· No
specific observation was identified in the reporting month.
Landscape and Visual
Impact
· The broken branches should be pruned back to
the union. Pruning shall follow “Guidelines on Tree Pruning” of GLTMS, DEVB
(Dec 2023)
Hazard to Life
· No
specific observation was identified in the reporting month.
Permit/ Licenses
· No
specific observation was identified in the reporting month.
Other
· No
specific observation was identified in the reporting month.
Contract DE/2020/01:
Air Quality Impact
· No specific observation was identified in the
reporting month
Construction Noise
Impact
· No specific observation was identified in the
reporting month
Water Quality Impact
· No
specific observation was identified in the reporting month.
Chemical Waste and
Construction Waste Management
· No specific observation was identified in the
reporting month.
Land Contamination
· No
specific observation was identified in the reporting month.
Ecological Impact
· No
specific observation was identified in the reporting month.
Hazard to Life
· No
specific observation was identified in the reporting month.
Permit/ Licenses
· No specific observation was identified in the
reporting month.
Other
· No
specific observation was identified in the reporting month.