7. LAND
CONTAMINATION
7.1 Contamination Assessment Report
7.1.1 Risk-Based
Remediation Goals (RBRGs) for Industrial have been adopted for the “Main
Storeroom & Workshops” and the laboratory results for the sampling works (conducted
between 30 June 2021 to 16 July 2021) show that there are no exceedances of the
adopted RBRGs for the “Main Storeroom & Workshops”. As no contaminated soil
and groundwater was found within the “Main Storeroom & Workshops”, no remediation
actions are required for contaminated soil and groundwater for the scheduled
land use of the “Main Storeroom & Workshops”. Their findings are summarized
in Contamination Assessment Report (CAR) and submitted to EPD on 1 November 2021.
7.1.2 Risk-Based Remediation Goals (RBRGs) for
Industrial have been adopted for the “Mechanical Workshop” and the laboratory
results for the sampling works (conducted between 23 July 2021 to 4 August 2021)
show that there are no exceedances of the adopted RBRGs for the “Mechanical
Workshop”. As no contaminated soil and groundwater was found within the
“Mechanical Workshop”, no remediation actions are required for contaminated
soil and groundwater for the scheduled land use of the “Mechanical Workshop”. Their
findings are summarized in Contamination Assessment Report (CAR) and submitted
to EPD on 23 November 2021.
7.1.3 Risk-Based
Remediation Goals (RBRGs) for Industrial have been adopted for the “Waste
Storage Area” and the laboratory results for the sampling works (conducted
between 24 November 2021 to 6 January 2022) show that there are no exceedances
of the adopted RBRGs for the “Waste Storage Area”. As no contaminated soil and
groundwater was found within the “Waste Storage Area”, no remediation actions
are required for contaminated soil and groundwater for the scheduled land use
of the “Waste Storage Area”. Their findings are summarized in Contamination
Assessment Report (CAR) and submitted to EPD on 29 April 2022.
7.1.4 Risk-Based Remediation Goals (RBRGs) for
Industrial have been adopted for the “SAS Thickener House-1” and the laboratory
results for the sampling works (conducted between 13 April 2022 to 16 May 2022)
show that there are no exceedances of the adopted RBRGs for the “SAS Thickener
House-1”. As no contaminated soil and groundwater was found within the “SAS
Thickener House-1”, no remediation actions are required for contaminated soil
and groundwater for the scheduled land use of the “SAS Thickener House-1”. Their
findings are summarized in Contamination Assessment Report (CAR) and submitted
to EPD on 6 July 2022.
7.1.5 Risk-Based
Remediation Goals (RBRGs) for Industrial have been adopted for the “SAS
Thickener House-2” and the laboratory results for the sampling works (conducted
between 15 February 2023 to 23 February 2023) show that there are no
exceedances of the adopted RBRGs for the “SAS Thickener House-2”. The
laboratory results are compared against the adopted RBRGs and soil saturation
limit (Csat) for soil samples and the adopted RBRGs
and the solubility limits for groundwater samples. No exceedance of RBRG are recorded for both soil samples and groundwater samples. Furthermore,
no exceedance of the soil saturation limit are recorded
for soil samples. However, the exceedances of solubility limits for PCRs
(C9-C16) are recorded for groundwater samples collected at BH-18, BH-19, BH-20
and BH-21; and also PCRs (C17-C35) for BH-21. As no non-aqueous
phase liquid (NAPL) was observed during sampling, no further sampling and remediation
are required. As no contaminated soil and groundwater is found within the “SAS
Thickener House-2”, no remediation actions are required for contaminated soil
and groundwater for the scheduled land use of the “SAS Thickener House-2”. Their
findings are summarized in Contamination Assessment Report (CAR) which was certified
by ET Leader and verified by IEC on 31 May 2023 and submitted to EPD on 19th
June 2023.