Table 28 Status of submissions required under the EP
EP
Condition (EP-565/2019) |
Submission Title |
Submission Status |
Condition 2.9 |
Construction Phase Emergency Response Plan |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 2.11 |
Pre-construction
Ardeid Night Roost Survey Report |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
EM&A Manual Sec. 7.3.3 & 7.3.4 |
Baseline Bird Survey Report |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 2.12 |
Noise
Mitigation Measures Plan |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 2.13 |
Proposal for Minimization of Overspill Light to
Ecological Sensitive Areas |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 2.14 |
Supplementary Contamination
Assessment Plan |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 2.14 |
Contamination Assessment Report for Main Storeroom
& Workshops |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 2.14 |
Contamination
Assessment Report for Mechanical Workshop |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 2.14 |
Contamination Assessment Report for Waste Storage
Area |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 2.14 |
Contamination
Assessment Report for SAS Thickener House-1 |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 2.14 |
Contamination Assessment Report for SAS Thickener
House-2 |
Certified by ET Leader and verified by IEC on 31 May
2023 and submitted to EPD on 19 Jun 2023, to be finalised and made available
for public inspection via the dedicated website. |
Condition 2.15 |
Landscape and
Visual Mitigation Plan |
Submitted to EPD with ET certification and IEC
verification, to be finalised and made available for public inspection via
the dedicated website. |
Condition 3.3 |
Baseline Monitoring Report |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 3.4 |
Monthly
EM&A Report (from April 2021 to June 2023) |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 3.5 |
Quarterly EM&A Report (from April 2021 to June
2023) |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |
Condition 4.2 |
Environmental
Monitoring Data from April 2021 to June 2023 |
Submitted to EPD with ET certification and IEC
verification, finalised and available for public inspection via the dedicated
website. |