12.                   CONCLUSION AND RECOMMENDATION

12.1                    Conclusions

12.1.1               1-hour TSP impact monitoring was carried out in the reporting month. No Action / Limit Level exceedance at AM1 and AM2 was recorded during the period.

12.1.2               Construction noise monitoring was carried out in the reporting month. No Action / Limit Level exceedance at CM1, CM2 and CM3 was recorded during the period.

12.1.3               No Action and Limit Level exceedance was recorded for water quality at M1, M2 and M3 in the reporting month.

12.1.4               Ardeid night roost monitoring was carried out in the reporting month. Two active ardeid night roost areas (ANR1 and ANR2) were observed within the Survey Area. These roosts were located at the mangrove strips in the east and northeast portions of the Project boundary. No Action / Limit Level exceedance at NMS1 and NMS2 was recorded during the period.

12.1.5               Ecological bird monitoring was carried out in the reporting month. No Action / Limit exceedances was recorded for the ecological monitoring of birds during the period.

12.1.6               Four environmental site inspections were carried out in the reporting month. Recommendations on mitigation measures for Permit/ Licenses were given to the Contractor for remediating the deficiencies identified during the site inspections.

12.1.7               Four landscape and visual site audits were carried out in the reporting month. Recommendations on mitigation measures for Permit/ Licenses were given to the Contractor for remediating the deficiencies identified during the site inspections.

12.1.8               No environmental complaint, notification of summons and successful prosecution was recorded in the reporting month.


 

12.2                  Comment and Recommendations

12.2.1               The recommended environmental mitigation measures, as proposed in the EIA report and EM&A Manual shall be effectively implemented to minimize the potential environmental impacts from the Project. The EM&A programme would effectively monitor the environmental impacts generated from the construction activities and ensure the proper implementation of mitigation measures.

12.2.2               According to the environmental site inspections performed in the reporting month, the following recommendations were provided:

 

Air Quality Impact

·        The Contractor is reminder to increase watering for dust suppression at TTS area.

Construction Noise Impact

·        No specific observation was identified in the reporting month.

Water Quality Impact

·        The Contractor is recommended to provide mitigation measures to prevent silty runoff getting into the storm drain in STB and TTS Areas.

Chemical Waste and Construction Waste Management

·        The Contractor is reminded to clear the oil stain on ground under the compressor and treat it as chemical waste for disposal.

Land Contamination

·        No specific observation was identified in the reporting month.

Ecological Impact

·        The Contractor is recommended to maintain and reinstate the bird curtains at the eastern and northern site boundary.

Landscape and Visual Impact

·        Please keep tree protection zone free of construction materials.

Hazard to Life

·        No specific observation was identified in the reporting month.

Permit/ Licenses

·        No specific observation was identified in the reporting month.