7. LAND
CONTAMINATION
7.1 Contamination Assessment Report
7.1.1 Risk-Based
Remediation Goals (RBRGs) for Industrial have been adopted for the “Main
Storeroom & Workshops” and the laboratory results for the sampling works (conducted
between 30 June 2021 to 16 July 2021) show that there are no exceedances of the
adopted RBRGs for the “Main Storeroom & Workshops”. As no contaminated soil
and groundwater was found within the “Main Storeroom & Workshops”, no
remediation actions are required for contaminated soil and groundwater for the
scheduled land use of the “Main Storeroom & Workshops”. Their findings are
summarized in Contamination Assessment Report (CAR) and submitted to EPD on 1 November
2021.
7.1.2 Risk-Based Remediation Goals (RBRGs) for
Industrial have been adopted for the “Mechanical Workshop” and the laboratory
results for the sampling works (conducted between 23 July 2021 to 4 August 2021)
show that there are no exceedances of the adopted RBRGs for the “Mechanical
Workshop”. As no contaminated soil and groundwater was found within the
“Mechanical Workshop”, no remediation actions are required for contaminated
soil and groundwater for the scheduled land use of the “Mechanical Workshop”. Their
findings are summarized in Contamination Assessment Report (CAR) and submitted
to EPD on 23 November 2021.
7.1.3 Risk-Based
Remediation Goals (RBRGs) for Industrial have been adopted for the “Waste
Storage Area” and the laboratory results for the sampling works (conducted
between 24 November 2021 to 6 January 2022) show that there are no exceedances
of the adopted RBRGs for the “Waste Storage Area”. As no contaminated soil and
groundwater was found within the “Waste Storage Area”, no remediation actions
are required for contaminated soil and groundwater for the scheduled land use
of the “Waste Storage Area”. Their findings are summarized in Contamination Assessment
Report (CAR) and submitted to EPD on 29 April 2022.
7.1.4 Risk-Based Remediation Goals (RBRGs) for
Industrial have been adopted for the “SAS Thickener House-1” and the laboratory
results for the sampling works (conducted between 13 April 2022 to 16 May 2022)
show that there are no exceedances of the adopted RBRGs for the “SAS Thickener
House-1”. As no contaminated soil and groundwater was found within the “SAS
Thickener House-1”, no remediation actions are required for contaminated soil
and groundwater for the scheduled land use of the “SAS Thickener House-1”. Their
findings are summarized in Contamination Assessment Report (CAR) and submitted
to EPD on 6 July 2022.
7.1.5 Risk-Based
Remediation Goals (RBRGs) for Industrial have been adopted for the “SAS Thickener
House-2” and the laboratory results for the sampling works (conducted between 15
February 2023 to 23 February 2023) show that there are no exceedances of the
adopted RBRGs for the “SAS Thickener House-2”, hence no contaminated soil or groundwater
is found within the “SAS Thickener House-2”. Their findings are summarized in
Contamination Assessment Report (CAR) which was certified by ET Leader and
verified by IEC on 30 March 2023 and will be submitted to EPD.