Table 10.1 – Status of submissions required under the EP
EP Condition (EP-565/2019) |
Submission Title |
Submission
Status |
Condition 2.9 |
Construction Phase Emergency Response Plan |
Submitted to EPD with ET certification and IEC verification, to
be finalised and made available for public inspection via the dedicated website. |
Condition 2.11 |
Pre-construction Ardeid Night Roost Survey Report |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
EM&A Manual
Sec. 7.3.3 & 7.3.4 |
Baseline Bird Survey Report |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.12 |
Noise
Mitigation Measures Plan |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.13 |
Proposal for Minimization of Overspill Light to Ecological Sensitive
Areas |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Supplementary Contamination Assessment Plan |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination
Assessment Report for Main Storeroom & Workshops |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination Assessment Report for Mechanical Workshop |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination Assessment Report for Waste Storage Area |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination Assessment Report for SAS
Thickener House-1 |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination Assessment Report for SAS
Thickener House-2 |
Certified by ET Leader and verified by IEC on 30 March 2023 and
will be submitted to EPD, to be finalised and made available for public
inspection via the dedicated website. |
Condition 2.15 |
Landscape and Visual Mitigation Plan |
Submitted to EPD with ET certification and IEC verification, to
be finalised and made available for public inspection via the dedicated
website. |
Condition 3.3 |
Baseline Monitoring Report |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 3.4 |
Monthly EM&A Report (from April 2021 to February 2023) |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 3.5 |
Quarterly EM&A Report (from April 2021 to December 2022) |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 4.2 |
Environmental Monitoring Data from April 2021 to February 2023 |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |