9. NON-COMPLIANCE, COMPLAINTS,
NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS
9.1 Non-compliance
(Exceedances of AL
levels)
9.1.1 No Action / Limit Level
exceedance was recorded for 1-hr TSP level at AM1 and AM2 in the reporting month.
9.1.2 No Action / Limit Level exceedance was
recorded for construction noise at CM1, CM2 and CM3 in the reporting month.
9.1.3 No Action and Limit
Level exceedance were recorded for water quality at M1, M2 and M3 in the
reporting month.
9.1.4 No Action / Limit exceedance was recorded
for noise levels at stations (NMS1 and NMS2) in close
proximity to the active ardeid night roosts in the reporting month.
9.1.5 No Action / Limit exceedances
was recorded for the ecological monitoring of birds on 12 April 2023
(night-time) / 14 April 2023 (daytime).
9.1.6 No
corrective actions were required according to the Event and Action Plans for
the Monitoring Parameters.
9.2 Complaints, Notification of Summons and Successful Prosecutions
9.2.1 No environmental
complaints, notification of summons and successful prosecutions was recorded in
the reporting month.
9.2.2 Cumulative complaint log, summaries of
complaints, notification of summons and successful prosecutions are presented
in Appendix L.
9.2.3 No corrective actions
were required.