Table 10.1 – Status of submissions required under the EP
EP Condition (EP-565/2019) |
Submission Title |
Submission
Status |
Condition 2.9 |
Construction Phase Emergency Response Plan |
Submitted to EPD with ET certification and IEC verification, to
be finalised and made available for public inspection via the dedicated
website. |
Condition 2.11 |
Pre-construction Ardeid Night Roost Survey Report |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
EM&A Manual
Sec. 7.3.3 & 7.3.4 |
Baseline Bird Survey Report |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.12 |
Noise
Mitigation Measures Plan |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.13 |
Proposal for Minimization of Overspill Light to Ecological Sensitive
Areas |
Submitted to EPD with ET certification and IEC verification, finalised
and available for public inspection via the dedicated website. |
Condition 2.14 |
Supplementary Contamination Assessment Plan |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination
Assessment Report for Main Storeroom & Workshops |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination Assessment Report for Mechanical Workshop |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination Assessment Report for Waste Storage Area |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination Assessment Report for SAS
Thickener House-1 |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 2.14 |
Contamination Assessment Report for SAS
Thickener House-2 |
Certified by ET Leader and verified by IEC on 30 March 2023 and
submitted to EPD, to be finalised and made available for public inspection
via the dedicated website. |
Condition 2.15 |
Landscape and Visual Mitigation Plan |
Submitted to EPD with ET certification and IEC verification, to
be finalised and made available for public inspection via the dedicated
website. |
Condition 3.3 |
Baseline Monitoring Report |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 3.4 |
Monthly EM&A Report (from April 2021 to March 2023) |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 3.5 |
Quarterly EM&A Report (from April 2021 to March 2023) |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |
Condition 4.2 |
Environmental Monitoring Data from April 2021 to March 2023 |
Submitted to EPD with ET certification and IEC verification,
finalised and available for public inspection via the dedicated website. |