12.
CONCLUSION
AND RECOMMENDATION
12.1
Conclusions
12.1.1
1-hour TSP impact
monitoring was carried out in the reporting month. No Action / Limit Level
exceedance at AM1 and AM2 was recorded during the period.
12.1.2
Construction noise
monitoring was carried out in the reporting month. No Action / Limit Level
exceedance at CM1, CM2 and CM3 was recorded during the period.
12.1.3
No Action and Limit
Level exceedance was recorded for water quality at M1, M2 and M3 in the
reporting month.
12.1.4
Ardeid night roost
monitoring was carried out in the reporting month. Two active ardeid night
roost areas (ANR1 and ANR2) were observed within the Survey Area. These roosts
were located at the mangrove strips in the east and northeast portions of the
Project boundary. No Action / Limit Level exceedance at NMS1 and NMS2 was
recorded during the period.
12.1.5
Ecological bird
monitoring was carried out in the reporting month. Two exceedances in Action
Level and one in Limit Level were recorded for the ecological monitoring of
birds on 13 February 2023. These include significant declines in point count
method result for species diversity of all avifauna species, and for species
diversity of avifauna species with conservation importance. Since the
significant decline in point count method result for species diversity of avifauna
species with conservation importance has been recorded for over three
consecutive months, it is now considered a limit level exceedance. However, the
exceedances were not project-related.
12.1.6
Five environmental
site inspections were carried out in the reporting month. Recommendations on
mitigation measures for Permit/ Licenses were given to the Contractor for
remediating the deficiencies identified during the site inspections.
12.1.7
Five landscape and
visual site audits were carried out in the reporting month. Recommendations on
mitigation measures for Permit/ Licenses were given to the Contractor for
remediating the deficiencies identified during the site inspections.
12.1.8
No environmental
complaint, notification of summons and successful prosecution was recorded in
the reporting month.
12.2
Comment and Recommendations
12.2.1
The recommended
environmental mitigation measures, as proposed in the EIA report and EM&A
Manual shall be effectively implemented to minimize the potential environmental
impacts from the Project. The EM&A programme would effectively monitor the
environmental impacts generated from the construction activities and ensure the
proper implementation of mitigation measures.
12.2.2
According to the
environmental site inspections performed in the reporting month, the following
recommendations were provided:
Air Quality Impact
·
Fugitive dust is observed at TTS area. Provide mitigation measure e.g. increase water spraying for dust suppression at TTS
area.
·
The Contractor is reminded to increase watering for dust suppression at
TTS area.
Construction Noise Impact
·
No specific observation was identified in the reporting month.
Water Quality Impact
·
No specific observation was identified in the reporting month.
Chemical Waste and Construction Waste Management
·
The Contractor is reminded to provide drip tray for the chemical containers.
Land Contamination
·
No specific observation was identified in the reporting month.
Ecological Impact
·
No specific observation was identified in the reporting month.
Landscape and Visual Impact
·
Crown cleaning to remove broken and hanging branches at east side of TTS.
·
Please observe proper pruning procedures to avoid causing damages to the
branches to be pruned.
Hazard to Life
·
No specific observation was identified in the reporting month.
Permit/ Licenses
·
No specific observation was identified in the reporting month.