12.
CONCLUSION
AND RECOMMENDATION
12.1
Conclusions
12.1.1
1-hour TSP impact
monitoring was carried out in the reporting month. No Action / Limit Level
exceedance at AM1 and AM2 was recorded during the period.
12.1.2
Construction noise
monitoring was carried out in the reporting month. No Action / Limit Level
exceedance at CM1, CM2 and CM3 was recorded during the period.
12.1.3
No Action and Limit
Level exceedance were recorded for water quality at M1 and M3 in the reporting
month.
12.1.4
One Action Level
exceedance was recorded for water quality in the reporting month. The
exceedance was recorded at M2 on 23 August 2022. It was found that this
exceedance was not project-related.
12.1.5
Ardeid night roost
monitoring was carried out in the reporting month. Two active ardeid night
roost areas (ANR1 and ANR2) were observed within the Survey Area. These roosts
were located at the mangrove strips in the east and northeast portions of the
Project boundary. No Action / Limit Level exceedance at NMS1 and NMS2 was
recorded during the period.
12.1.6
Ecological bird
monitoring was carried out in the reporting month. No Action / Limit Level
exceedance was recorded for the ecological monitoring of birds on this period.
12.1.7
Five environmental
site inspections were carried out in the reporting month. Recommendations on
mitigation measures for Permit/ Licenses were given to the Contractor for
remediating the deficiencies identified during the site inspections.
12.1.8
Five landscape and
visual site audits were carried out in the reporting month. Recommendations on
mitigation measures for Permit/ Licenses were given to the Contractor for
remediating the deficiencies identified during the site inspections.
12.1.9
No environmental
complaint, notification of summons and successful prosecution was recorded in
the reporting month.
12.2
Comment and Recommendations
12.2.1
The recommended
environmental mitigation measures, as proposed in the EIA report and EM&A
Manual shall be effectively implemented to minimize the potential environmental
impacts from the Project. The EM&A programme would effectively monitor the
environmental impacts generated from the construction activities and ensure the
proper implementation of mitigation measures.
12.2.2
According to the
environmental site inspections performed in the reporting month, the following
recommendations were provided:
Air Quality Impact
·
No specific observation was identified in the reporting month.
Construction Noise Impact
·
The Contractor is reminded to maintain and reinstate the silentup at western and northern site boundary.
Water Quality Impact
·
The Contractor is reminded to provide sandbags to prevent runoff into
storm drain near piling area.
Chemical Waste and Construction Waste Management
·
Clean up the oil stain on road with chemical absorbent pad and treat it
as chemical waste for disposal.
Land Contamination
·
No specific observation was identified in the reporting month.
Ecological Impact
·
No specific observation was identified in the reporting month.
Landscape and Visual Impact
·
Stockpile to be removed from tree protection zone beside the temporary
admin office (MIC).
·
Please keep tree protection zone free of construction material beside
the temporary admin office (MIC).
·
Ficus microcarpa at eastern / northern edge of site are observed with “朱紅毛斑蛾”, please liaise
with relevant maintenance parties for
pest control.
·
Please keep tree protection zone clear of construction material outside
MIC area.
Hazard to Life
·
No specific observation was identified in the reporting month.
Permit/ Licenses
·
No specific observation was identified in the reporting month.