10. IMPLEMENTATION STATUS OF ENVIRONMENTAL
MITIGATION MEASURE
10.1 Implementation
Status of Environmental
Protection and Pollution Control / Mitigation Measures
The Contractor had implemented
environmental protection and pollution control / mitigation measures as stated
in the EIA Report, the EP and EM&A Manual. Appendix J summarized the Implementation Status of
Environmental Mitigation Measures.
The status of
required submissions under the EP as of the reporting period are summarized in Table 10.1.