12.                   CONCLUSION AND RECOMMENDATION

12.1                    Conclusions

12.1.1               1-hour TSP impact monitoring was carried out in the reporting month. No Action / Limit Level exceedance at AM1 and AM2 was recorded during the period.

12.1.2               Construction noise monitoring was carried out in the reporting month. No Action / Limit Level exceedance at CM1, CM2 and CM3 was recorded during the period.

12.1.3               No Action and Limit Level exceedance was recorded for water quality at M1, M2 and M3 in the reporting month.

12.1.4               Ardeid night roost monitoring was carried out in the reporting month. Two active ardeid night roost areas (ANR1 and ANR2) were observed within the Survey Area. These roosts were located at the mangrove strips in the east and northeast portions of the Project boundary. No Action / Limit Level exceedance at NMS1 and NMS2 was recorded during the period.

12.1.5               Ecological bird monitoring was carried out in the reporting month. Two exceedances in Action Level were recorded during this period’s monitoring of birds including significant declines in point count method results for species diversity of all avifauna species in the community; and species diversity of species of conservation importance. However, the exceedances were not project-related.

12.1.6               Five environmental site inspections were carried out in the reporting month. Recommendations on mitigation measures for Permit/ Licenses were given to the Contractor for remediating the deficiencies identified during the site inspections.

12.1.7               Five landscape and visual site audits were carried out in the reporting month. Recommendations on mitigation measures for Permit/ Licenses were given to the Contractor for remediating the deficiencies identified during the site inspections.

12.1.8               No environmental complaint, notification of summons and successful prosecution was recorded in the reporting month.


 

12.2                  Comment and Recommendations

12.2.1               The recommended environmental mitigation measures, as proposed in the EIA report and EM&A Manual shall be effectively implemented to minimize the potential environmental impacts from the Project. The EM&A programme would effectively monitor the environmental impacts generated from the construction activities and ensure the proper implementation of mitigation measures.

12.2.2               According to the environmental site inspections performed in the reporting month, the following recommendations were provided:

 

Air Quality Impact

·        The Contractor is reminded to provide water spraying for dust suppression at loading/unloading area and haul roads.

Construction Noise Impact

·        No specific observation was identified in the reporting month.

Water Quality Impact

·        The Contractor is reminded to provide sandbags to prevent silty runoff into the storm drain.

Chemical Waste and Construction Waste Management

·        No specific observation was identified in the reporting month.

Land Contamination

·        No specific observation was identified in the reporting month.

Ecological Impact

·        The Contractor is reminded to maintain and reinstate the bird curtains at the eastern and northern site boundary.

Landscape and Visual Impact

·        Provide maintenance check after rainstorms for possible broken branches or other possible damages to trees.

Hazard to Life

·        No specific observation was identified in the reporting month.

Permit/ Licenses

·        No specific observation was identified in the reporting month.