10. IMPLEMENTATION STATUS OF ENVIRONMENTAL
MITIGATION MEASURE
The Contractor had implemented
environmental mitigation measures and requirements as stated in the EIA Report,
the EP and EM&A Manual. Appendix J
summarized the Implementation Status of Environment Mitigation Measures.
The status of
required submissions under the EP as of the reporting period are summarized in Table 10.1.